Patents
US 4,495,043 A#4459028 Most CitedExpiredUnited States (USPTO)Utility

Process for supplying electric power to an ozonizer

19Forward Citations (#4459028 Global)
0.5/yrCitation Velocity (#17682123 Global)
4.29Citation PageRank (#4248491 Global)
3Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

The ozonization installation comprises a group of n ozonizers supplied with energy by a common source in a successive alternating voltage wave train mode, the application of the wave trains being controlled by a control device. The latter produces initiating signals which selectively enable the passage of the electric energy in the form of wave trains coming from the common source to the ozonizer. The installation comprises a servo system chain comprising devices for controlling the duration of the initiating signals by means of a set signal, having regard to the total ozonization produced by the n ozonizers. This duration corresponds to that of each successive wave train. Synchronization devices are provided for connecting the common energy source to solely one ozonizer at a time.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 19.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    In a method for supplying electric power to an ozone producing element comprising at least two conductive electrodes disposed in facing relation to each other and between which electrodes a gas to be ozonized flows, comprising the step of applying to said electrodes sequential bursts of electrical energy with a voltage whose amplitude value is capable of producing electronic discharges between electrodes with each burst comprising a wave train of alternating voltage, the bursts being separated from each other in time by time periods during which the volume of gas treated by a first burst will

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (3)