Start-up system for once-through boilers
Abstract
A start-up system for once-through boilers including the reduction of minimum flow during start-up to 15% full load by the use of multi-lead internal ribbed tubing to the enclosure tubes in the high heat input zones, the use of a variable pressure by-pass stop valve in the main flow path, a pressure reducing means in the by-pass system and two steam spray attemperators from the flash tank or separators. The first steam attemperation is to the outlet of the secondary superheater and the second to the outlet of the reheater.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 26.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
In combination with a power plant system having a main once-through fluid flow path connected in series with furnace enclosure tubular means, primary and secondary superheaters, high and low pressure turbine means with a reheater connected therebetween, the improvement comprising utilization of multi-lead ribbed tubing as the tubular means whereby minimum start-up flow is reduced to approximately 15 percent of full load flow, a start-up system including a flash tank, valve means interposed between the primary and secondary superheater and in parallel with the main flow path whereby the transit
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗