Method for installing and connecting underwater flowlines
Abstract
In installation of a flowline and connection thereof to an underwater installation equipped with guide lines extending from the installation to an operational base at the surface of the body of water, a pile or other upright support is first installed in a predetermined location adjacent the underwater installation, and all operations necessary to install the flowline and connect the flowline to the underwater installation are then carried out with the aid of the guide lines and employing apparatus installed on the pile.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 0.
Claims (1)
- Claim 1Independent Claim
A method for installing an underwater flowline and connecting the flowline to an existing underwater installation equipped with guide lines extending from the underwater installation to an operational base at the surface of the body of water, comprising drilling an upright hole in the floor of the body of water by employing a guide arm unit coacting with the guide lines to position drilling apparatus to drill the hole in a predetermined location adjacent the underwater installation; inserting a support member in the hole by remote operations carried out with a guide arm unit coacting with th
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (5)
| Patent | Title | Year | Citations |
|---|