Swaging apparatus with timed pre-fill
Abstract
In an apparatus for forming leak-proof joints between tubes and a tube sheet by the internal application of hydraulic swaging pressure, the flow of relatively low pressure fluid from a pressure source to an intensifier is permitted or interrupted by a control valve. During a prefill period, a prefill valve causes the low pressure fluid to bypass the low pressure input side of the intensifier and flow directly to the high pressure side and then to a mandrel. Thereafter, the low pressure fluid is caused to enter the low pressure side of the intensifier to increase the pressure in the mandrel during a swaging period. A pressurization sensor, which is connected to the input and output sides of the prefill valve, contains a piston which is movable in response to the difference in the pressures at these two points to produce a termination signal which, after a delay, actuates the control signal at the end of the swaging period.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 14.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
An apparatus for forming leak-proof joints between tubes and tube sheets by the application of hydraulic swaging pressure comprising: pressure source means for supplying a hydraulic fluid under relatively low pressure; mandrel means including associated conduits for delivering said pressurized hydraulic fluid to said tubes internally; intensifier means for increasing the pressure of said fluid, said intensifier means having a low pressure input side and a high pressure output side connected to said mandrel means; and prefill means for causing said low pressure fluid to flow first to said
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗