Fixing bridge
Abstract
A fixing bridge for attachment to the goaf side of a channel section on a scraper-chain conveyor, is provided with connectors for the attachment of anchoring devices. A first connector is provided adjacent to one end of the fixing bridge, and a second connector is provided adjacent to the other end of the fixing bridge. The second connector is vertically off-set with respect to the first connector.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 1.
Claims (2 — 2 Independent, 0 Dependent)
- Claim 1Independent Claim
In a mineral mining installation including a conveyor and at least one pair of roof support units with advance mechanisms connected to the goaf side of the conveyor, an elongate fixing bridge adapted to be secured to the goaf side of said conveyor between said advance mechanisms, said bridge having a first connector adjacent to one end thereof and a pair of second connectors adjacent to the opposite end thereof, said first connector lying on a longitudinal axis of said bridge and including means for accepting a block anchoring arrangement located between said advance mechanisms, and said secon
- Claim 2Independent Claim
A fixing bridge according to cla
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 10,914,170 B2 | Roof support connector | 2021 | 1 |