Patents
US 4,456,560 A#36207164 Most CitedExpiredUnited States (USPTO)Utility

Process for the preparation of N-allyl-O-alkyl thionocarbamates

2Forward Citations (#36207164 Global)
0.1/yrCitation Velocity (#53610776 Global)
1.19Citation PageRank (#32634060 Global)
1Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

An improvement in the process for the preparation of N-allyl-O-alkyl thionocarbamates by the reaction of an allyl isothiocyanate with an alcohol is disclosed which comprises the use of a catalyst of the general formula: ##STR1## wherein R 1 , R 2 , R 3 , R 4 , and R 5 are individually selected from alkyl or aryl or a mixture thereof, M represents a metal from Group III B, IV B, or V B of the Periodic Table of the Elements, and n is the integer 0 or 1; provided that the sum of n 1 , n 2 , n 3 , n 4 , and n 5 equals the valance of said metal M.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 1 · Forward citations: 2.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    In a process for the preparation of N-allyl-O-alkyl thionocarbamates by reaction of an allyl isothiocyanate with an alcohol in the presence of a catalytic amount of a catalyst, the improvement comprising: said catalyst being a compound having the general formula: ##STR5## wherein R 1 , R 2 , R 3 , R 4 , and R 5 are individually selected from alkyl or aryl or mixtures thereof, M is a metal selected from Group III B, IV B, or V B of the Periodic Table of the Elements, n is the integer 0 or 1, and provided that the sum of n 1 , n 2 , n 3 , n 4 , and n 5 equals the valence of the metal; said imp

  2. Claim 2Depends on #1

    The improved process of claim 1 wherein said metal is selected from Group IV B of the Periodic Table of the Elements.

  3. Claim 3Depends on #2

    The improved process of claim 2 wh

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (1)