Patents
US 4,451,067 A#1636316 Most CitedExpiredUnited States (USPTO)Utility

Comprehensive, central scheduling folder for project management

36Forward Citations (#1636316 Global)
0.9/yrCitation Velocity (#8348911 Global)
36.58Citation PageRank (#120927 Global)
10Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A management scheduling folder having a plurality of panels bound together. Each panel has pockets to support a column of project cards in overlapping arrangement to expose a portion of each card. A special calendar is mounted beside each column of cards and formed with a plurality of linear calendars extending laterally of the card in substantial alignment with the exposed portions of cards. Each card therefore has its own linear calendar on which to note its scheduling in close association with the card as well as closely associated with the calendars for other project cards.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 36.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    An improved management scheduling folder of the type having a front panel hingedly connected to a rear panel and having at least one intermediate panel hingedly connected intermediate the front and rear panels, wherein the improvement comprises the combination of: (a) a plurality of project cards having selected, identical dimensions; (b) a plurality of panel surfaces formed on said panels, each panel surface having a plurality of card-receiving pockets arranged in a column and spaced and aligned to position cards received in said pockets in overlapping arrangement to expose a portion of eac

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗