Method and apparatus for controlled off peak load hot water heating
Abstract
Apparatus and method for controlling a hot water heater to heat water during off peak load hours to a desired temperature by the end of a predetermined period of time. The heating is in partial increments, the water being heated a partial amount in each of a plurality of predetermined time segments with a view to reaching the desired temperature at the end of the predetermined time period. The water is heated by adjusting the heater at each segment to its maximum power or a portion thereof. The method includes the steps of computing the heater power required for the next time segment, setting the heater power accordingly, waiting until the end of the time segment, determining the new temperature of the water, and repeating the steps until the end of the time period.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 44.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of heating water over a predetermined period of time comprising the steps of: (1) determining the temperature of water in a water heater; (2) computing the portion of the maximum power of the heater that is required to raise the temperature of the water over a predetermined segment of the predetermined period of time an amount that is related to the total desired temperature increase over the entire predetermined period of time; (3) setting the power of the heater to the computed portion; (4) waiting until the end of the predetermined segment of the predetermined period of time;
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗