Process for direct heat treatment of track links for tractors or tracked vehicles
Abstract
Process for the manufacture of steel track links for tracked vehicles, comprising forging steel track links at an initial forging temperature of 1150°-1200° C. for 45-60 seconds with a finish forging temperature of 950°-1050° C., subjecting the links thus-produced to initial cooling at a rate of 2°-4° C./s to a temperature of 720°-830° C., maintaining the links at a temperature of 800°-850° C. for 2-3 minutes, again cooling the links at a rate of 10°-15° C./s to a second temperature of 180°-380° C., and maintaining the links at this second temperature for a period of 10-20 minutes, the steel having the following weight percent compositions: C: 0.30-0.38 Mn: 1.00-1.50 Cr: up to 0.60 Si: 0.15-0.35 S+P: about 0.06 balance essentially iron.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 5.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
Process for the manufacture of steel track links for tracked vehicles, comprising forging steel track links at an initial forging temperature of 1150°-1200° C. for 45-60 seconds with a finish forging temperature of 950°-1050° C., subjecting the links thus-produced to initial cooling at a rate of 2°-4° C./s to a temperature of 720°-830° C., maintaining the links at a temperature of 800°-850° C. for 2-3 minutes, again cooling the links at a rate of 10°-15° C./s to a second temperature of 180°-380° C., and maintaining the links at said second temperature for a period of 10-20 minutes, the steel h
- Claim 2Depends on #1
Process as claimed in claim 1, in which said second temperature is 300°-380° C. and is foll
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗