Method to upgrade sewage treatment plants overloaded in continuous operation
Abstract
A method to upgrade existing sewage treatment plants which become overloaded in long-term continuous operation by passing waste water or a part stream thereof through a filter device which is installed additionally prior and/or subsequent to at least one overloaded stage of the treatment plant. Thus method replaces preclarification, clearing, thickening and sludge dehydration steps for a part of waste water to be treated and also a part of the biological degradation by a simple purification process using the separated solids as an alluvial filter layer. A sewage treatment plant for waste water treatment by said method is described.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 14.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of increasing the capacity of an existing sewage treatment plant comprising passing by means of gravity at least a portion of waste water through a filter device arranged (1) prior to or (2) subsequent to or (3) prior and subsequent to a conventional treatment stage of said sewage treatment plant stage, said filter device being at least one suspended, tube-like woven fabric filter element and an inner filter layer of solids resulting from solids separated during the filtration process from the waste water along the woven fabric filter thus water passes through the filter wall while se
- Claim 2Depends on #1
A method as claimed in claim 1 wherein the filtrate emerging through the wall
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗