Method of drilling a productive bed
Abstract
The present invention relates to the completion of wells and, more particularly, it relates to a method of drilling a productive bed. The herein disclosed method of drilling a productive bed comprises the tapping of the bed roof using a starting flushing fluid and the determination of the redox potential value at the moment of tapping the bed roof, and subsequent replacement of the starting flushing fluid with a fluid having redox potential value and sign equal to those of the productive bed rock.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 5.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of drilling a productive bed in a well, comprising the tapping of the bed roof and the use of a starting flushing fluid, and determining the redox potential value of the productive bed rock, wherein the improvement comprises altering the physical-chemical properties of the starting flushing fluid leaving the well until they correspond to the physical-chemical properties of the productive bed rock; altering the sign and value of the redox potential of the starting flushing fluid leaving the well until they correspond to the sign and value of the redox potential of the productive bed ro
- Claim 2Depends on #1
A method as claimed in claim 1, wherein the value and sign of the redox potential of the productive bed rock are determined at the moment of tapping said bed, from the deviat
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗