Heating system control device
Abstract
A heating system control device is responsive to the drop in outside temperature to below a predetermined weatherhead set point for turning on a heating system to be controlled. Upon the establishment of the heat in the heating system, a defined heating cycle is carried out consisting of a heat-on portion and a heat-off portion having a duty cycle dependent on the outside temperature. The heating cycle does not start until there is an establishment of heat in the heating system. The start of consecutive heating cycles is delayed in response to a check for heat loss in the system. When heat is established and the set point has not been reached, as noted by the means for determining the establishment of heat in the heating system, the next cycle will be delayed to save energy.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 7.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A heating system control device comprising: means responsive to the dropping of the outside temperature to below a predetermined weatherhead set point for turning on a heating system to be controlled; means for determining the establishment of heat in the heating system to be controlled; means defining a heating cycle consisting of a heat-on portion and a heat-off portion having a duty cycle dependent on the outside temperature and starting in response to the establishment of heat in the heating system to be controlled; and means for checking for heat loss in the system to be controlled
- Claim 2Depends on #1
The device according to claim 1, wherein the means defining the heating cycle comprises an electronic clock, means for dividing each day
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗