Method of blasting pillars with vertical blastholes
Abstract
A fragmented permeable mass of formation particles is formed in an in situ oil shale retort in a subterranean formation containing oil shale. Formation is excavated to form a horizontally extending void in the subterranean formation and a support pillar of unfragmented formation is left in the void for supporting overlying unfragmented formation. The support pillar is prepared for explosive expansion by forming an array of explosive charges along the centerline of the pillar between its opposed free faces. The amount of explosive on each side of the centerline is about equal. Explosive is then detonated in the support pillar for expanding the pillar about equally toward both opposed free faces. Thereafter, explosive is detonated in unfragmented formation above and/or below the void for explosively expanding the formation toward the void to form the fragmented permeable mass of formation particles.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 10.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for forming a fragmented permeable mass of formation particles in an in situ oil shale retort in a subterranean formation containing oil shale, comprising the steps of: (a) excavating formation to form at least one horizontally extending void in the subterranean formation, leaving at least one support pillar of unfragmented formation in the void, and leaving zones of unfragmented formation above and below the void and pillar, such a pillar having opposed free faces; (b) forming an array of explosive charges in at least one of such zones of unfragmented formation for explosively expa
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗