Form handling system
Abstract
A system is described whereby a large elongated monolithic conduit is formed within an excavation of a single continuous pour of concrete. The open core of the conduit is formed by an interconnected group of tubular form members, forming a static line within the excavation. The system includes a slipform mechanism that is progressively moved along the static line, molding wet concrete about the inner form sections. Successive inner form sections are disconnected from the rearward end of the static line (after the adjacent formed concrete has hardened), reduced in cross-sectional dimension, and transported forwardly through the static line to a forward conduit end. There the individual sections are expanded, cleaned and reattached to the front of the line as the slipform moves along. The successive inner form sections are disconnected, moved forwardly and re-expanded by a self-steering wheel supported transporter. The transporter is powered to move longitudinally within the static line. A trimmer is also provided at a forward end of the slipform to prepare a final grade within the excavation just prior to molding of the wet concrete.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 17.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system for forming an elongated monolithic concrete conduit within an excavation with releasably interconnected collapsible hollow inner form sections extending in a static line from a rearward end to a forward end comprising: slipform means for receiving and directing wet concrete about the interconnected inner form sections; drive means for moving the slipform means forwardly within the excavation as concrete is delivered to the slipform means; form section transporter means for successively: (a) collapsing a form section at the rearward end of the interconnected form members; (b) mo
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗