Patents
US 4,287,656 A#4271720 Most CitedExpiredUnited States (USPTO)Utility

Method of setting fastening elements in a hard receiving material

20Forward Citations (#4271720 Global)
0.4/yrCitation Velocity (#18174810 Global)
2.95Citation PageRank (#7773581 Global)
11Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

Fastening elements, such as bolts, studs or nails, are inserted into a hard receiving material, such as concrete or rock, first, by drilling a blind borehole into the receiving material. The diameter of the borehole is formed so that it is greater than the diameter of the leading end of the fastening element. A setting device containing the fastening element is then aligned with the blind borehole and the fastening element is driven into the receiving material. The fastening element enters the receiving material at the base of the blind borehole. The length of the fastening element inserted into the receiving material is at least half the axial length of the borehole and may have a length considerably greater than the axial length of the borehole.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 20.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    Method of setting fastening elements, such as bolts, nails and studs, in a hard receiving matrial, such as concrete and rock, comprising the steps of drilling a blind borehole into the receiving material, aligning an explosive powder-operated setting device containing a fastening element with the blind borehole, and driving the fastening element from the setting device through the blind borehole and into the receiving material.

  2. Claim 2Depends on #1

    Method, as set forth in claim 1, including the steps of providing the leading end portion of the fastening element with a diameter smaller than the diameter of the blind borehole, and driving the fastening element into the receiving material so that it enters the receiving material at the base of the blind borehole.

  3. Claim 3Depends on #2

    Method, as set forth in claim 2, including the step of drilling the

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗