Method and apparatus for the working of underwater deposits
Abstract
A method of working an underwater deposit comprises the following stages: (a) constructing and positioning a platform structure, equipped before or after positioning with drilling devices and installations, (b) executing drilling using these devices and installations, (c) constructing and equipping, during stages (a) and (b), a production bridge fitted with devices and installations required for production, (d) transporting the production bridge to, and positioning it on, said platform structure, and (e) commencing production from deposit. The drilling bridge may remain in position on the platform structure during stages (d) and (e), or it may be removed to make way for the production bridge.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 33.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
Apparatus for working an underwater deposit comprising: a platform structure for location resting on the bed of an area of water; drilling devices and installations fitted on said platform structure; supports on the platform structure capable of receiving a production bridge; a production bridge; production devices and installations fitted on the production bridge; means for transporting the production bridge to the platform structure and of placing it on the said supports; wherein the platform structure comprises a base enclosing a chamber suitably divided into water-tight compart
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗