Filling stand arrangement for a metallurgical ladle
Abstract
A filling stand arrangement for a metallurgical ladle with a ladle mouth, has at least one delivery device for molten metal and a hood covering the mouth of the metallurgical ladle, which hood has at least one recess for pouring in the molten metal. An exhaust conduit means, to which the hood is connected, is provided along with a flue dome located above the at least one delivery device. The flue dome is also connected to the exhaust conduit means and covers the delivery device and the at least one recess of the hood.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 7.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
In a filling stand arrangement for a metallurgical ladle having a ladle mouth and being movable to said filling stand arrangement, said filling stand arrangement including at least one delivery device for molten metal, a hood covering said ladle mouth and having at least one recess for pouring in said molten metal from said delivery device, and first exhaust conduit means connected directly to said hood, the improvement comprising a flue dome provided above said at least one delivery device when said delivery device is in its pouring position, said flue dome connected to said first exhaust con
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗