Monitoring the conduction cutoff phase angles in rectifiers
Abstract
In order to monitor the conduction cutoff phase angles of a plurality of controllable rectifiers arranged in two groups in a rectifier bridge, a signal proportional to the angle for each rectifier is stored in a respective sample and hold member after each occurrence of a positive blocking voltage at that rectifier, and the minimum of the currently stored signals is observed.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 6.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
In a method for monitoring the conduction cutoff phase angles of a plurality of current rectifier elements of a rectifier bridge circuit constituted by two groups of such elements, by forming, in an integrator for each group, a signal proportional in amplitude to the most recent cutoff phase angle for that group, determined by the time between the end of current conduction and the beginning of a positive blocking voltage of a respective element of that group, by erasing the integration value provided by each integrator at the beginning of a positive blocking voltage at an element of the respec
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗