Patents
US 4,133,581 A#8939635 Most CitedExpiredUnited States (USPTO)Utility

Method of strip mining with cable supported conveyor

11Forward Citations (#8939635 Global)
0.2/yrCitation Velocity (#30633213 Global)
3.17Citation PageRank (#6922670 Global)
10Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

An aerial conveyor system comprises a pair of spaced apart cables extending from a first vehicle including material delivery apparatus across a material receiving zone, across an open area, and across a material discharge zone to a second vehicle. The cables support a plurality of conveyor support frames each comprising a pair of tubular members extending substantially parallel to the cables, a plurality of hook rollers for supporting the tubular members on the cables, and a plurality of transversely disposed conveyor support rollers. An endless conveyor belt is mounted for movement around a course defined by the conveyor support rollers of the conveyor support frames and functions to transport material received from the delivery apparatus of the first vehicle in the receiving zone across the open area to the discharge zone. The conveyor is driven by apparatus including a drive roller mounted at the discharge zone end of the conveyor support frame which is actuated by hydraulic fluid supplied through the tubular elongate members thereof. In the use of the aerial conveyor system, overburden is preferably removed in accordance with a series of vertically stacked zones. The aerial con

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 11.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    In a strip mining process of the type in which overburden covering an ore-bearing layer is excavated to facilitate mining of the ore-bearing layer, the improvement comprising: extending at least one cable across the excavation from a point adjacent the unexcavated overburden to a point above a previously mined portion of the excavation; supporting an aerial conveyor from the thus extended cable; removing overburden from one side of the excavation in accordance with a predetermined sequence of vertical zones including a topsoil zone and at least one subsoil zone and thereby progressively un

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗