Patents
US 4,124,071 A#4092613 Most CitedExpiredUnited States (USPTO)Utility

High vertical and horizontal conformance viscous oil recovery method

20Forward Citations (#4092613 Global)
0.4/yrCitation Velocity (#19150679 Global)
6.44Citation PageRank (#2197285 Global)
5Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Disclosed is an oil recovery method especially useful for recovering viscous oil from thick formations including tar sand deposits. The method comprises several phases which accomplish efficient recovery of the viscous oil from the formation with good vertical and horizontal sweep conformance or effectiveness. The first phase may utilize as few as two spaced apart wells, one for fluid injection and one for oil production and an oil recovery method such as injecting steam or a mixture of air and steam for low temperature, controlled oxidation is a preferred fluid for use in the first phase. After fluid breakthrough at the production well occurs, the producer of the first phase is converted to an injection well and one or more new production wells outside of the pattern swept by the injected fluid are completed in the oil formation. Thermal recovery fluids are then injected into two wells with the displacement moving in the direction of the new production wells. The oil displacement process of the second phase may be air or oxygen for high temperature in situ combustion. In thick formations, if the wells utilized in the first phase are completed low in the formation, the new producti

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 20.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for recovering viscous petroleum from a subterranean, viscous petroleum-containing formation comprising: (a) penetrating the formation with at least two spaced apart wells, one of which is completed as an injection well and one of which is completed as a production well, both wells being completed near the bottom of the formation; (b) injecting a first thermal oil recovery fluid into the injection well and recovering petroleum from the formation via the production well to form a first depleted zone in the formation, until breakthrough of the first thermal recovery fluid at the produ

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗