Method of laying subsoil membranes
Abstract
A method for laying subsoil membranes includes dragging a hollow cutting blade through the soil at a predetermined depth, providing a supply of sheeting to the interior of the blade and feeding the sheeting from the interior of the blade through an opening therein. The hollow blade has a cutting edge, a rear edge and an upper section having an upwardly sloping front portion and a downwardly sloping rear portion connected by a center portion. The bottom portion of the blade slopes in an upward direction from its front to form a release angle. The sheet material is fed out of an opening in the rear of the blade.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 14.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of laying subsoil membranes comprising the steps of: (a) dragging through the soil, at a predetermined depth, a hollow, cutting blade having an interior chamber, a leading cutting edge arranged transverse to direction of motion and upstream of said chamber, a front portion upwardly sloping from said leading cutting edge and a rear portion downstream from said chamber and downwardly sloping and having a rear edge, the rear edge no lower than the level of the cutting edge of the blade; (b) providing a roll of a prefabricated thin sheeting of a pliable material within the interior cham
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗