Laying of underwater pipelines
Abstract
For laying a pipeline on the bed of the sea, a plurality of pipeline sections are successively towed by a tug exerting a traction effort at a point spaced to the rear of the front end of a pipeline section being towed, while another tug exerts a holding effort at a point spaced in front of the rear end, the front and rear ends being maintained near to the surface by a system of floats and trail-ropes and the intermediate portion of the pipeline section being ballasted so as to be supported on the sea bed, whereafter the front end of the pipeline section is welded to the rear end of a preceding section, and so on.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 8.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
Apparatus for laying a pipeline on the bed of a body of water by the process consisting of successively towing in the body of water first and second pipeline sections each having a front end and a rear end, then joining the front end of the first section to the rear end of the second section, comprising towing means, including a traction machine, for applying a traction effort at a traction point on a pipeline section being towed to draw the same forward, said traction point being spaced from the front end of said section being towed; holding means, including a holding machine, for applying
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗