Deck section loading
Abstract
An elongated deck section having two rows of legs with several legs per row is fabricated with the legs hingedly mounted on footings adapted to receive fluid bearings and is transported from the fabricating yard to a dock head over a smooth concrete slab of minimal slope and thence longitudinally via fluid bearing adapted gang planks and tracks onto and along a barge disposed with its stern adjacent the dock head and grounded thereat, the platform being transported by placing fluid bearings under the footings which allow the section to be moved sideways, lengthways, or rotated or turned, as desired, the deck's horizontal truss stresses and the fluid bearing loads being controlled by actuating fluid elevators between each leg and the fluid bearing thereunder, the barge being initially ballasted so that change of ballast during loading is unnecessary to maintain minimal slope of the barge, the section then being anchored to the barge and the barge reballasted to float its stern and trim the barge preparatory to towing it to sea for installation of the deck section on an offshore tower as part of an offshore platform.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 20.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
Method of transferring a load to a vessel grounded at a certain land based site comprising the steps of grounding only that portion of the vessel which is adjacent to the site, providing a fluid bearing path on the vessel and extending between the vessel and the site, floating the load along the path onto the vessel on fluid bearings, grounding the load on the vessel, and floating the vessel, the vessel being grounded by ballasting, and prior to load transfer the vessel being ballasted sufficiently to maintain itself level to within plus or minus two percent inclination during load
- Claim 2Depends on #1
Method of claim 1 in which there is no change of ballast during load transfer and after the load is grounded to the vessel, the grounded portion of the vessel is floated by changing the ballast.
- Claim 3Depends on #2
Method of claim 2 in
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗