Control of roofing procedure
Abstract
A system of temperature determination and control for molten bituminous material during construction of built-up roofs is provided wherein a heating temperature is preselected based upon a number of factors and is adjusted insofar as may be called for upon checking the temperature upon application to the roof deck. Factors considered in the predetermination include type of bituminous material, type of roofing material, and deck type and temperature; ambient temperature, cloud cover, and wind speed; and also opportunities for cooling of the bituminous material between temperature-controlled and deck locations, during application to the deck, and thereafter until application of an overlying layer of roofing material.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 6.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
In formation of built-up roofs using molten bituminous material to adhere layers of roofing material, the improvement comprising heating bituminous material to melt it, sensing the temperature of the bituminous material being heated, sensing the temperature of molten bituminous material on the roof deck, and adjusting the heating temperature so that the temperature of the molten bituminous material applied to the deck will be within a predetermined satisfactory adhesion temperature range.
- Claim 2Depends on #1
Roof formation according to claim 1, wherein the bituminous material is asphalt and the heating temperature of the melt thereof is maintained within about ±25° F of a preselected temperature between about 350° F and 500° F.
- Claim 3Depends on #1
Roof formation according to claim 1, wherein the bituminous material is pitch and the heating te
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗