Patents
US 4,034,677 A#3495554 Most CitedExpiredUnited States (USPTO)Utility

Railroad classification yards

23Forward Citations (#3495554 Global)
0.5/yrCitation Velocity (#17492205 Global)
2.88Citation PageRank (#8074158 Global)
2Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Two car retarders and an interposed means to push the cars are installed on a storage track. The upstream retarder slows the cars. The downstream retarder collects the cars released from the upstream retarder. The cars, coupled as a block, are pushed from the downstream retarder.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 2 · Forward citations: 23.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for coupling railroad cars on a railroad storage track, wherein the track is equipped with an upstream car retarder and downstream car retarder, and wherein the track is also equipped with means to forcefully move cars toward a point downstream of the downstream retarder, comprising: operating the upstream retarder to slow the entering cars one-by-one to a predetermined speed, allowing each of the slowed cars to drift toward the downstream retarder, actuating the downstream retarder to stop and hold a lead car, maintaining the downstream retarder activated as additional cars drift tow

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (15 of 23 total)

PatentTitleYearCitations
US 6,418,854 B1Priority car sorting in railroad classification yards using a continuous multi-stage method200258
US 2010222948 A1System and method for computing rail car switching solutions by assessing space availability in a classification track on the basis of block pull time—0
CN 105,774,818 BA kind of four line length of urban track traffic underground is apart from parallel separated structure20180
US 2010222947 A1System and method for computing car switching solutions in a switchyard using car eta as a factor—1
US 6,516,727 B2High capacity multiple-stage railway switching yard200369
CN 105,774,818 AUrban rail transit underground four-wire long-distance parallel separation structure—2
US 2008119973 A1System and method for computing rail car switching sequence in a switchyard—4
US 8,060,263 B2System and method for forecasting the composition of an outbound train in a switchyard20114
US 8,055,397 B2System and method for computing rail car switching sequence in a switchyard20113
US 7,983,806 B2System and method for computing car switching solutions in a switchyard using car ETA as a factor201111
US 2010235021 A1System and method for computing rail car switching solutions in a switchyard including logic to re-switch cars for arrival rate—1
US 2010324760 A1System and method for computing rail car switching solutions in a switchyard using an iterative method—0
US 8,239,079 B2System and method for computing rail car switching sequence in a switchyard20120
US 2007156298 A1System and method for computing rail car switching solutions by assessing space availability in a classification track on the basis of arrival profile—0
WO 0,242,142 A1High capacity multiple-stage railway switching yard—16

References Cited — Backward Prior Art (2)