Production of hydrogen fluoride and calcium sulfate
Abstract
In the production of hydrofluoric acid and calcium sulfate by subjecting sulfuric acid and fluorspar to a partial preliminary reaction in a preliminary reaction zone and the reaction is completed in an after-reaction zone at a temperature from about 100° to 500° C, the improvement which comprises effecting the preliminary reaction by circulating preliminary reaction product through said preliminary reaction zone, adding to the circulating preliminary reaction product at spaced locations in the preliminary reaction zone sulfuric acid preheated to a temperature of about 80° to 200° C and fluorspar preheated to a temperature of about 400° to 800° C, removing from said preliminary reaction zone gaseous hydrofluoric acid and a substantially dry mixture of calcium sulfate, unreacted sulfuric acid and fluorspar, and passing said dry mixture of calcium sulfate, unreacted sulfuric acid and fluorspar to said after-reaction zone. Only some of the necessary sulfuric acid may be supplied to the preliminary reaction zone and the balance supplied to the after-reaction zone. Heating of the preliminary reaction zone can be external or materials can be added which will react exothermically, e.g. SO
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 14.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
In the production of hydrofluoric acid and calcium sulfate by subjecting sulfuric acid and fluorspar to a partial preliminary reaction in a preliminary reaction zone and the reaction is completed in an after-reaction zone at a temperature from about 100° to 500° C, the improvement which comprises effecting the preliminary reaction by circulating preliminary reaction product comprising partially reacted fluorspar mixed with calcium sulfate through said preliminary reaction zone comprising first and second adjacent beds connected together at their ends, continuously adding to the circulating pre
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗