Patents
US 3,979,092 A#4712010 Most CitedExpiredUnited States (USPTO)Utility

Sequential occupancy release control method and apparatus for train vehicles

18Forward Citations (#4712010 Global)
0.4/yrCitation Velocity (#21760229 Global)
9.45Citation PageRank (#1165495 Global)
4Prior Art Cited
3Claims (2 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

An improved train vehicle speed control system is provided for operation in conjunction with train speed control signals and train occupancy indication signals in relation to a train vehicle track system including a plurality of predetermined track circuit signal blocks through which train vehicles pass. It is desired that a control of train vehicle speed be provided in relation to the detected occupancy by a train vehicle of a particular signal block, for maintaining train vehicle occupancy protection requirements and providing desired sequential occupancy control of the train vehicles through each of successive signal blocks through operation of provided protection signals with selected signal blocks behind the detected train vehicle. Spurious pseudo vehicle occupancy in a given signal block is detected and included in the provided train speed control in relation to that given signal block.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 18.

Claims (3 — 2 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    In apparatus for controlling the speed of a plurality of train vehicles along a track including a plurality of signal blocks, the combination of means for providing an occupancy indication signal in relation to the sensed occupancy of a first signal block by one of said train vehicles, means for providing a first protection signal in response to said occupancy indication signal, and means for providing an occupancy control signal in response to the provision of said occupancy indication signal and in response to said first protection signal to determine a zero speed code for a second signa

  2. Claim 2Depends on #1

    The apparatus of claim 1, with said occupancy control signal being operative to control the speed of another train vehicle in relation to said second signal block.

  3. Claim 3Independent Claim

    The ap

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗