Abstract
A method of forming a row of concrete piles in ground is disclosed wherein it is possible to position piles sufficiently close that additional concrete shoring on either side or between piles is unnecessary. A hole for a pile is first bored, the ground forming the hole is hardened and thereafter filled with concrete. This process is repeated for subsequently drilled holes until the row is completed. A drill is also disclosed which includes jet means to force ground hardening liquid under high pressure into the ground surrounding the hole. The jet means may be rotatably and/or axially moveable within the hole.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 61.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method for forming a continuous row of piles comprising the steps of: boring a first hole in the ground; hardening the ground surrounding said first hole by forcing a ground hardening liquid under high pressure into said ground surrounding said first hole; filling said first hole with mortar; boring a second hole adjacent said first hole; hardening the ground surrounding said second hole by forcing a ground hardening liquid under high pressure into said ground surrounding said second hole, a portion of the ground surrounding said first and second holes being common to both said holes
- Claim 2Depends on #1
The method of claim 1, wherein the step of hardening the ground forming said holes is by forcing ground ha