Patents
US 3,863,718 A#1107159 Most CitedExpiredUnited States (USPTO)Utility

Cementing procedure for avoiding mud channeling

46Forward Citations (#1107159 Global)
0.9/yrCitation Velocity (#7918306 Global)
3.76Citation PageRank (#5251484 Global)
7Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

When cementing a pipe section (such as a production casing or liner) in a well, problems due to mud channeling are avoided by displacing the drilling fluid (before running-in the pipe section) and replacing the drilling fluid with a subsequently solidifiable liquid that remains pumpable while the pipe section is being installed and the cement slurry is being injected, and then solidifies, during or after, the solidifying of the cement.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 46.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A process for installing a pipe section that is to be cemented within a drilling-fluid-containing portion of a borehole of a well, which process comprises; extending a relatively slender pipe string having an outer diameter significantly less than the borehole diameter into the borehole until it extends to at least near the bottom of the portion of the borehole in which the pipe section is to be cemented; flowing fluid through the relatively slender pipe string to displace substantially all of the drilling fluid out of that portion of the borehole; filling that portion of the borehole substant

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗