Pile installation
Abstract
Piles are installed by driving a tubular lower pile shell section into the ground to a first location beyond which the shell section refuses to penetrate, thereafter, filling the shell with concrete, allowing the concrete to harden and stiffen the shell, and thereafter continuing to drive the concreted shell down to a final bearing depth substantially beyond the first location.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 27.
Claims (3 — 2 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of forming a pile in the earth comprising the steps of driving a hollow tube, closed at the bottom, down into the earth to a first location less than the depth at which penetration refusal is experienced, then filling the tube with a flowable castable material to stiffen the tube, allowing the castable material to harden and thereafter further driving the tube with the castable material hardened therein further down substantially beyond said first location to a final bearing depth.
- Claim 2Depends on #1
A method of forming a pile according to claim 1, wherein the castable material is concrete and said concrete is allowed to harden about four days before said further driving.
- Claim 3Independent Claim
A method of forming a pile in the earth comprising the steps of driving a first tube down into the earth, filling the tube with a castable material to stiffen same, allowing the ca
Technical Overview & Description