Method of post-tensioning prestressed concrete
Abstract
A pre-cut length of cable and a dead anchor are preassembled and inspected to provide a cable and dead anchor assembly for shipment to the job site. The assembly apparatus is a frame having a slot in one end wall to receive the assembly and a hydraulic cylinder having a tubular ram which pushes the jaw cluster of the anchor into the anchor shell to develop a permanent wedging engagement of the jaw cluster, cable and shell. The push force applied is less than that at which tooth deformation would occur which would cause material reduction of the holding power of the anchor during a later cable tensioning operation. After inspection of the jaw set, a cap is placed over the large end of the shell to prevent entry of the concrete mix.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 25.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
In the method of post-tensioning concrete slabs or the like which involves the use of a jacketed cable having a dead anchor end with a jaw cluster in a shell, and a live anchor end, and which includes the step of applying a tension to the live anchor end of the cable after the concrete has set so as to develop a tension stress in the cable between the dead anchor and the live anchor, the step of preassembling, before applying tension to the live anchor, the cable and the dead anchor, and applying a force to the rear end of the jaw cluster of said dead anchor in such direction and of a magnitud
- Claim 2Depends on #1
The method as claimed in claim 1 in which the force applied to said jaw cluster is less than that at which tooth deformation of the jaw teeth causes material r