Method for handling column of drill pipe during drilling operations
Abstract
A method for removing or installing a column of drill pipe or tubing relative to a well bore during drilling or workover operations wherein the drill string is moved from the well bore preferably in one continuous piece without breaking it into shorter sections, and is moved in an upwardly and radially outwardly curved path from the well bore to a substantially horizontal attitude for storage preferably in a generally circular configuration on the ground or support means for later return to the well bore moving approximately along the same path, and as one piece.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 27.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of handling a column of drill pipe suspended beneath a conventional drilling rig which incorporates a rotary drilling mechanism, a draw works for supporting the column of drill pipe, and a mud supply connected to the column of drill pipe for circulating mud through the drill bit connected at the lower end which advances the well bore on rotation, and wherein the column of drill pipe is sufficient in length to extend toward the bottom of the well bore, and wherein it becomes necessary on occasion to interrupt the drilling process and remove the column of drill pipe from the well bore,
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗