Method of assembling a prestressed conduit in a wall
Abstract
A method of constructing in a subterranean well a prestressed conduit for conveying heated fluids wherein there is positioned in the well bore two concentric tubing strings having support elements in the annular space therebetween. The annular space is sealed at one end by attaching the tubing strings together. The inner tubing is then elongated and the annulus sealed at the other end thereof.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 19.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A process for constructing conduits for conveying heated fluids comprising: a. positioning in a subterranean cased well dual concentric tubing strings comprising an inner fluid conductor tubing and a surrounding larger diameter intermediate tubing, having from 1 to 3 supports per 30 feet of length between these strings, and a centralizer device on the larger string at each joint thereof, b. fixedly and sealably attaching the fluid conductor tubing to the intermediate tubing at the lower end thereof, c. elongating the fluid conductor tubing member of said dual concentric tubing string, d. fixed
- Claim 2Depends on #1
The process of claim 1 wherein the elongation is accompl
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 19 total)
References Cited — Backward Prior Art (6)
Non-Patent Literature (1)
- Leutwyler, Kurt, et al. Temperature Effects on Subsurface Equipment in Steam Injection Systems. In J. Pet. Tech., Jan., 1965, pp. 93 101. (Copy in 166-303)