Patents
US 3,286,648 A#5990452 Most CitedExpiredUnited States (USPTO)Utility

Rail renewal process

15Forward Citations (#5990452 Global)
0.2/yrCitation Velocity (#28132715 Global)
12.11Citation PageRank (#772574 Global)
4Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 15.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A METHOD FOR REPLACING THE RAILS ON THE EXISTING TIES OF A TRACK STRUCTURE WITH CONTINUOUS RIBBON RAILS COMPRISING THE STEPS OF: LAYING THE NEW RAILS AT A NARROW GAUGE BETWEEN THE OLD RAILS OF THE STANDARD GAUGE TRACK TO FORM A SERVICE TRACK; REMOVING SPIKES AND RAIL ANCHORS FROM THE STANDARD GAUGE TRACK; CLEANING THE ENDS OF THE TIES OF THE TRACK STRUCTURE OUTWARDLY OF EACH OF THE RAILS OF THE STANDARD GAUGE TRACK; MOVING THE OLD RAILS RESPECTIVELY OUTWARDLY ONTO THE CLEANED ENDS OF THE TIES; GAUGING THE OLD RAILS AT A PREDETERMINED WIDE GAUGE TO FORM A SECOND SERVICE TRACK; REMOVING OLD TIE

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗