Patents
US 3,263,753 A#9758994 Most CitedExpiredUnited States (USPTO)Utility

Well completion method and system

10Forward Citations (#9758994 Global)
0.2/yrCitation Velocity (#35894381 Global)
6.29Citation PageRank (#2281140 Global)
3Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 10.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    IN A SUBSEA WELL TRAVERSING A FIRST PRODUCING SUBSURFACE FORMATION AND A SECOND PRODUCING SUBSURFACE FORMATION VERTICALLY SEPARATED FROM SAID FIRST PRODUCING SUBSURFACE FORMATION: A FIRST TUBING STRING EXTENDING TO A POINT ADJACENT THE UPPER PRODUCING SUBSURFACE FORMATION; A SECOND TUBING STRING EXTENDING TO A POINT ADJACENT THE LOWER PRODUCING SUBSURFACE FORMATION; UPPER PACKING MEANS ABOUT THE FIRST TUBING STRING AND THE SECOND TUBING STRING AND ABOVE THE UPPER PRODUCING SUBSURFACE FORMATION; LOWER PACKING MEANS ABOUT THE SECOND TUBING STRING AND BETWEEN THE UPPER AND LOWER PRODUCING SUBSURF

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (3)