Well completion method and system
Abstract
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 10.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
IN A SUBSEA WELL TRAVERSING A FIRST PRODUCING SUBSURFACE FORMATION AND A SECOND PRODUCING SUBSURFACE FORMATION VERTICALLY SEPARATED FROM SAID FIRST PRODUCING SUBSURFACE FORMATION: A FIRST TUBING STRING EXTENDING TO A POINT ADJACENT THE UPPER PRODUCING SUBSURFACE FORMATION; A SECOND TUBING STRING EXTENDING TO A POINT ADJACENT THE LOWER PRODUCING SUBSURFACE FORMATION; UPPER PACKING MEANS ABOUT THE FIRST TUBING STRING AND THE SECOND TUBING STRING AND ABOVE THE UPPER PRODUCING SUBSURFACE FORMATION; LOWER PACKING MEANS ABOUT THE SECOND TUBING STRING AND BETWEEN THE UPPER AND LOWER PRODUCING SUBSURF
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (10 of 10 total)
References Cited — Backward Prior Art (3)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2,923,357 A | Dual completion well installation | 1960 | 36 |
| US 3,032,113 A | Extension hanger | 1962 | 8 |
| US 3,040,813 A | Plural completion of wells | 1962 | 6 |