Well operation
Abstract
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 1 · Forward citations: 6.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A METHOD FOR PREVENTING BLOWOUT OF A DRILLING WELL WHILE PULLING PIPE FROM THE WELL BORE, COMPRISING THE STEPS OF: CONTINUOUSLY DETERMINING THE AMOUNT OF PIPE REMOVED FROM THE WELL; CONTINUOUSLY MONITORING THE PRESENCE OF DRILLING FLUID AT A PREDETERMINED LEVEL IN THE WELL; PUMPING DRILLING FLUID INTO THE WELL AS NEEDED WHEN SAID FLUID IS BELOW SAID LEVEL, TO RETURN THE HEIGHT OF DRILLING FLUID UP TO SAID VESSEL; MEASURING THE DRILLING FLUID ADDED TO THE WELL; RECORDING THE AMOUNT OF PIPE REMOVED FROM THE WELL; RECORDING THE AMOUNT OF DRILLING FLUID ADDED TO THE WELL; AND ADJUSTING THE QUANTIT
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (6 of 6 total)
References Cited — Backward Prior Art (1)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2,832,566 A | Method for maintaining level of drilling fluid | 1958 | 21 |