US 3,088,674 A#40133930 Most CitedExpiredUnited States (USPTO)Utility
Railway track support
2Forward Citations (#40133930 Global)
0.0/yrCitation Velocity (#57550407 Global)
1.01Citation PageRank (#41199786 Global)
11Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets
Abstract
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
RAILWAY PERMANENT WAY INCLUDING A FOUNDATION, A BASE MEMBER ON THE FOUNDATION, A RAIL AND SUPPORTING MEANS FOR THE RAIL COMPRISING AT LEAST ONE LONGITUDINAL INTERMEDIATE BEAM BETWEEN THE BASE MEMBER AND THE RAIL, RAISED PORTIONS AT EACH END OF THE LONGITUDINAL BEAM, ON WHICH THE RAIL RESTS, AND A STRIP OF RESILIENT MATERIAL DISPOSED BETWEEN SAID BASE MEMBER AND SAID LONGITUDINAL INTERMEDIATE BEAM, SAID RESILIENT MATERIAL BEING STAGGERED IN RELATION TO THE RAISED PORTIONS IN PLAN AND SIDE VIEWS.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 4,130,244 A | Track rail support | 1978 | 3 |
| EP 0,249,574 B1 | Concrete sleeper system | 1991 | 1 |
References Cited — Backward Prior Art (11)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 109,504 A | fisher | 1870 | 1 |
| US 208,957 A | Improvement in railway-tracks | 1878 | 1 |
| US 758,613 A | Concrete railway-tie. | 1904 | 1 |
| US 771,862 A | Railway-tie. | 1904 | 1 |
| US 896,501 A | Railway-tie. | 1908 | 1 |
| US 1,139,753 A | Railroad-tie. | 1915 | 1 |
| US 1,191,044 A | Railway-tie. | 1916 | 4 |
| US 1,218,141 A | Railway-tie. | 1917 | 6 |
| US 1,413,085 A | Railway tie | 1922 | 2 |
| US 1,704,545 A | Track construction | 1929 | 12 |
| US 2,779,543 A | Railroad tie construction | 1957 | 21 |