hottub.patents
US 2025/0355425 A1#2745330 Most CitedPendingUnited States (USPTO)Application

CLOUD-BASED LINE MANAGEMENT TRACEABILITY

0Forward Citations (#2745330 Global)
0.0/yrCitation Velocity (#2745330 Global)
0.00Citation PageRank (#2745330 Global)
0Prior Art Cited
20Claims (3 Indep. · 17 Dep.)
0Drawings / Sheets

Abstract

A multi-tenant, cloud-based Software-as-a-Service (SaaS) manufacturing cloud system offers a variety of industrial applications to end customers, including but not limited to MES, ERP, quality management, supply chain management, and customer relationship management (CRM). The system includes extensibility tools that allows industrial customers to customize databases, data collection templates, reporting fields, and other features of their consumed services, eliminating the need for these features to be customized by an administrator of the cloud system. Some embodiments of the manufacturing cloud system can also leverage generative artificial intelligence (AI) in connection with executing its supported services.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 0.

Claims (20 — 3 Independent, 17 Dependent)

  1. Claim 1Independent Claim

    A system, comprising: a memory that stores executable components; and a processor, operatively coupled to the memory, that executes the executable components, the executable components comprising: internal services that implement a manufacturing cloud system, wherein the manufacturing cloud system is a multi-tenant Software-as-a-Service (SaaS) system that executes a supply chain analytics service that collects multi-tenant data from multiple entities of a supply chain, the multiple entities comprising at least a manufacturing entity; an analytics component configured to, based on a first analysis of the multi-tenant data, identify a change to a predicted state of the supply chain and, based on a second analysis of the multi-tenant data and the change to the predicted state of the supply chain, formulate a modification to a production schedule of the manufacturing entity that causes a business metric of the manufacturing entity to satisfy an optimization criterion; and a scheduling component configured to implement the modification to the production schedule.

  2. Claim 2Depends on #1

    The system of claim 1, wherein the business metric is at least one of a profitability metric, a demand fulfilment metric, an energy consumption metric, a production cost metric, or an emissions metric.

  3. Claim 3Depends on #1

    The system of claim 1, wherein the multi-tenant data comprises at least one of production data from the manufacturing entity, the production schedule, an inventory level of a product manufactured by the manufacturing entity or a component part used to manufacture the product, customer demand data for the product, purchase order data for the manufacturing entity, transportation scheduling data from a transportation entity, shipping route information for the transportation entity, or a production schedule of a supplier entity that manufactures a component part or material used by the manufacturing entity to manufacture the product.

  4. Claim 4Depends on #1

    The system of claim 1, wherein the change to the predicted state of the supply chain is at least one of a change in availability of a component part or material used by the manufacturing entity, a change to a product transportation schedule, a supply chain disruption, or a change in a demand for a product manufactured by the manufacturing entity.

  5. Claim 5Depends on #1

    The system of claim 1, wherein the modification to the production schedule at least one of changes a type of product scheduled to be manufactured on a production line for a specified time period, changes a time period during which a product is scheduled to be produced, or changes a source from which to obtain a component part or material used by the manufacturing entity to produce the product.

  6. Claim 6Depends on #1

    The system of claim 1, wherein the multiple entities of the supply chain further comprise at least one of supplier entities, manufacturing entities, transportation entities, warehouse entities, retail entities, or distributor entities.

  7. Claim 7Depends on #1

    The system of claim 1, wherein the analytics component is further configured to generate and send configuration data to one or more industrial devices operating at a plant facility of the manufacturing entity, and the configuration data configures the one or more industrial devices to implement the modification to the production schedule.

  8. Claim 8Depends on #7

    The system of claim 7, wherein the configuration data at least one of changes a configuration setting of an industrial device or changes control code being executed by an industrial controller to monitor and control an automation system.

  9. Claim 9Depends on #1

    The system of claim 1, wherein the scheduling component is further configured to modify another schedule of the manufacturing entity that causes the business metric of the manufacturing entity to satisfy the optimization criterion, and the other schedule is at least one of a work schedule, a shipping schedule for a product manufactured by the manufacturing entity, a purchase order for component parts used to manufacture the product, an inventory schedule for the product or the component part, or a bill of materials.

  10. Claim 10Depends on #1

    The system of claim 1, wherein the analytics component is configured to group a subset of the multi-tenant data corresponding to manufacturing entities that operate within a common industrial vertical, determine, based on analysis of the subset of the multi-tenant data, business strategies that correlate with satisfaction of the optimization criterion by the business metric, and formulate the modification to the production schedule based on the business strategies.

  11. Claim 11Independent Claim

    A method, comprising: implementing, by a manufacturing cloud system comprising a processor, a multi-tenant Software-as-a-Service (SaaS) system that executes a supply chain analytics service that collects multi-tenant data from multiple entities of a supply chain, the multiple entities comprising at least a manufacturing entity; identifying, by the manufacturing cloud system based on first analysis of the multi-tenant data, a change to a predicted state of the supply chain; in response to the identifying, formulating, by the manufacturing cloud system based on second analysis of the multi-tenant data and the change to the predicted state of the supply chain, a modification to a production schedule of the manufacturing entity predicted to cause a business metric of the manufacturing entity to satisfy an optimization criterion; and implementing, by the manufacturing cloud system, the modification to the production schedule.

  12. Claim 12Depends on #11

    The method of claim 11, wherein the business metric is at least one of a profitability metric, a demand fulfilment metric, an energy consumption metric, a production cost metric, or an emissions metric.

  13. Claim 13Depends on #11

    The method of claim 11, wherein the multi-tenant data comprises at least one of production data from the manufacturing entity, the production schedule, an inventory level of a product manufactured by the manufacturing entity or a component part used to manufacture the product, customer demand data for the product, purchase order data for the manufacturing entity, transportation scheduling data from a transportation entity, shipping route information for the transportation entity, or a production schedule of a supplier entity that manufactures a component part or material used by the manufacturing entity to manufacture the product.

  14. Claim 14Depends on #11

    The method of claim 11, wherein the change to the predicted state of the supply chain is at least one of a change in availability of a component part or material used by the manufacturing entity, a change to a product transportation schedule, a supply chain disruption, or a change in a demand for a product manufactured by the manufacturing entity.

  15. Claim 15Depends on #11

    The method of claim 11, wherein the implementing comprises at least one of changing a type of product scheduled to be manufactured on a production line for a specified time period, changing a time period during which a product is scheduled to be produced, or changing a supplier entity from which to obtain a component part or material used by the manufacturing entity to produce the product.

  16. Claim 16Depends on #11

    The method of claim 11, wherein the multiple entities of the supply chain further comprise at least one of supplier entities, manufacturing entities, transportation entities, warehouse entities, retail entities, or distributor entities.

  17. Claim 17Depends on #11

    The method of claim 11, further comprising: generating configuration data directed to one or more industrial devices operating at a plant facility of the manufacturing entity, wherein the configuration data is configured to reconfigure the one or more industrial devices to implement the modification to the production schedule; and sending, by the manufacturing cloud system, the configuration data to the one or more industrial devices.

  18. Claim 18Depends on #17

    The method of claim 17, wherein the configuration data at least one of changes a configuration setting of an industrial device or changes control code being executed by an industrial controller to monitor and control an automation system.

  19. Claim 19Independent Claim

    A non-transitory computer-readable medium having stored thereon instructions that, in response to execution, cause a manufacturing cloud system comprising a processor to perform operations, the operations comprising: collecting multi-tenant data from multiple entities of a supply chain, the multiple entities comprising at least a manufacturing entity; identifying, by the manufacturing cloud system based on a first analysis of the multi-tenant data, a change to a predicted state of the supply chain; in response to the identifying, formulating, based on a second analysis of the multi-tenant data and the change to the predicted state of the supply chain, a modification to a production schedule of the manufacturing entity predicted to cause a business metric of the manufacturing entity to satisfy an optimization criterion; and implementing the modification to the production schedule.

  20. Claim 20Depends on #19

    The non-transitory computer-readable medium of claim 19, wherein the multi-tenant data comprises at least one of production data from the manufacturing entity, the production schedule, an inventory level of a product manufactured by the manufacturing entity or a component part used to manufacture the product, customer demand data for the product, purchase order data for the manufacturing entity, transportation scheduling data from a transportation entity, shipping route information for the transportation entity, or a production schedule of a supplier entity that manufactures a component part or material used by the manufacturing entity to manufacture the product.

Technical Overview & Description

TECHNICAL FIELD The subject matter disclosed herein relates generally to industrial automation systems, and, for example, to cloud-based industrial data collection, analysis, and sharing. BACKGROUND ART As cloud-based computing platforms become more widely available, industrial enterprises are exploring ways in which their operations can benefit by moving portions of their operations to the cloud. Moreover, the global scope afforded by cloud computing opens the possibility of multi-tenant industrial software that can serve multiple enterprises and users, and can assist in coordinating operations of facilities or supply chain entities in different locations. However, there are still challenges that render wider implementation of cloud-based industrial solutions difficult, including an inability to easily customize cloud-based services to the specific needs of each industrial customer. There are also limits on the capabilities of cloud-based industrial computing systems that could be overcome by leveraging a broader scope of data and integrating a wider range of tools. The above-described deficiencies of are merely intended to provide an overview of some of the problems of current technology, and are not intended to be exhaustive. Other problems with the state of the art, and corresponding benefits of some of the various non-limiting embodiments described herein, may become further apparent upon review of the following detailed description. BRIEF DESCRIPTION The following presents a simplified summary in order to provide a basic understanding of some aspects described herein. This summary is not an extensive overview nor is it intended to identify key/critical elements or to delineate the scope of the various aspects described herein. Its sole purpose is to present some concepts in a simplified form as a prelude to the more detailed description that is presented later. In one or more embodiments, a system is provided, comprising internal services that implement a manu

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (0)

No backward patent references recorded.