hottub.patents
US 2025/0354473 A1#2746232 Most CitedPendingUnited States (USPTO)Application

METHOD FOR BEDDING PRECISE PRESSURIZED WATER INJECTION BASED ON COAL SEAM INTERVAL HYDRAULIC GRADIENT CALCULATION

0Forward Citations (#2746232 Global)
0.0/yrCitation Velocity (#2746232 Global)
0.00Citation PageRank (#2746232 Global)
0Prior Art Cited
6Claims (1 Indep. · 5 Dep.)
0Drawings / Sheets

Abstract

Provided is a method for bedding precise pressurized water injection based on coal seam interval hydraulic gradient calculation, including: setting pressure measurement boreholes on both sides of a water injection borehole with the water injection borehole as the center, and installing monitoring devices to measure internal stress of the pressure measurement boreholes in real time; during the coal seam water injection process, real-time pressure changes are obtained to determine the along-the-path dynamic damage of the pressurized water; according to the pressure difference changes within different water injection radius ranges and the pressure change nodes of the pressure measurement boreholes, during a water injection process in the same coal seam, the coal seam water injection pressure should be increased in a timely manner at the corresponding time nodes. The method of the present disclosure can effectively avoid the phenomenon of water flooding caused by excessive initial pressure during water injection.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 0.

Claims (6 — 1 Independent, 5 Dependent)

  1. Claim 1Independent Claim

    A method for bedding precise pressurized water injection based on coal seam interval hydraulic gradient calculation, comprising following steps in sequence: step 1, based on the on-site basic data that the effective water invasion influence radius of a coal seam bedding water injection process is within 5 meters, constructing two pressure measurement boreholes on both sides of a water injection borehole with the water injection borehole as a center, respectively; distances between the two pressure measurement boreholes on a left side and the water injection borehole is 2 meters and 4 meters respectively, and distances between the two pressure measurement boreholes on a right side and the water injection borehole is 3 meters and 5 meters respectively; step 2, sealing the water injection borehole with two-plugging and one-injection; then, performing cement grouting to seal each pressure measurement borehole, and monitoring the stress changes inside each pressure measurement borehole through a monitoring device; step 3, recording an initial pressure value in each pressure measurement borehole before injecting water into coal seams, and then start injecting water; obtaining real time pressure changes in the water injection boreholes and each pressure measurement borehole during the coal seam water injection process, and conducting timing of pressure change nodes at different positions of the pressure measurement boreholes; based on the pressure difference and distance between the water injection borehole and the pressure measurement boreholes, and the difference between the initial pressure inside the pressure measurement boreholes and the pressure when the pressure inside the pressure measurement boreholes reach stable after the start of water injection, calculating the hydraulic gradient during the water injection process to obtain the dynamic damage of pressure water along the path; step 4, based on the pressure difference changes within different water injection radius ranges and the pressure change nodes of the pressure measurement boreholes, increasing the coal seam water injection pressure in a timely manner at the corresponding time nodes during the coal seam water injection process in the same coal seam.

  2. Claim 2Depends on #1

    The method for bedding precise pressurized water injection based on coal seam interval hydraulic gradient calculation according to claim 1, wherein in step 2, the sealing length of the water injection borehole is the length other than the distance that is not less than 5 meters from the borehole orifice to the borehole bottom of the water injection borehole; the sealing length of each pressure measurement borehole is within 10 meters from the borehole bottom of each pressure measurement borehole.

  3. Claim 3Depends on #1

    The method for bedding precise pressurized water injection based on coal seam interval hydraulic gradient calculation according to claim 1, wherein the monitoring device comprises stress-strain gauges and stress display instruments, stress display instruments are located near the borehole orifice of each pressure measurement borehole, stress-strain gauges are arranged in each pressure measurement borehole, and the stress-strain gauges transmit the stress changes in each pressure measurement borehole to the stress display instruments.

  4. Claim 4Depends on #1

    The method for bedding precise pressurized water injection based on coal seam interval hydraulic gradient calculation according to claim 1, wherein in step 1, the construction position of the borehole bottom of each pressure measurement borehole is 5 meters deeper than the construction position of the borehole bottom of the water injection borehole.

  5. Claim 5Depends on #1

    The method for bedding precise pressurized water injection based on coal seam interval hydraulic gradient calculation according to claim 1, wherein in step 4, increasing the coal seam water injection pressure is used to avoid the phenomenon of water flooding caused by excessive initial water injection pressure, and used to compensate for dynamic damage of the pressurized water.

  6. Claim 6Depends on #3

    The method for bedding precise pressurized water injection based on coal seam interval hydraulic gradient calculation according to claim 3, wherein the stress-strain gauges are pasted in each the pressure measurement borehole.

Technical Overview & Description

CROSS-REFERENCE TO RELATED APPLICATIONS This application claims priority to Chinese Application No. 202410610239.4, filed on May 16, 2024, entitled “ METHOD FOR BEDDING PRECISE PRESSURIZED WATER INJECTION BASED ON COAL SEAM INTERVAL HYDRAULIC GRADIENT CALCULATION ” . These contents are hereby incorporated by reference. TECHNICAL FIELD The present disclosure relates to the technical field of mine disaster prevention, in particular to a method for bedding precise pressurized water injection based on coal seam interval hydraulic gradient calculation. BACKGROUND Coal is currently one of the most abundant, widely distributed, and economically used energy resources in the world. Coal resources have long been the most important basic energy and industrial raw materials, making significant contributions to ensuring national energy security and stable socio-economic development. However, with the increasing depth and intensity of coal mining in China, significant changes have occurred in coal structure, coal seam temperature, and ground stress. The risk of high concentration dust in mines causing disasters is becoming increasingly high, which seriously affects the safe and efficient production of coal. As the coal seam water injection technology can significantly reduce the coal body ground stress, and at the same time increase the water content to inhibit the generation of coal dust, so the coal seam water injection technology has become a commonly used source dust reduction method in most mining areas in China. However, during the implementation of coal seam water injection on site, there are challenges such as difficulty in effectively cracking with low-pressure water injection and water flooding caused by high-pressure water injection, which will limit the dust reduction effect of coal seam water injection on site. At present, in order to avoid the impact of water flooding on the disaster prevention effect of coal seam water injection in existing technology, a stable pre

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (0)

No backward patent references recorded.