Method for determining a position of a water/cement boundary between pipes in a hydrocarbon well
Abstract
A method has been disclosed for determining a position of a water/cement boundary in an annular area between two concentric pipes in a hydrocarbon well. The method comprises the steps of running a well tool ( 10 ) into a central pipe of the well, where the well tool ( 10 ) comprises a tool housing ( 11 ), a pulse generator ( 14 ) and a signal recorder ( 16 ) provided within the housing ( 11 ); generating an electromagnetic pulse by means of the pulse generator, thereby providing physical vibrations in the central pipe of the well; recording reflected acoustic signals from the well by means of the signal recorder ( 16 ); repeating the generating and recording steps for different vertical positions of the pulse generator in the well; organizing the recorded signals in a two-dimensional representation; filtering the organized recorded signals in order to identify, in the two-dimensional representation, a hyperbola (B); and providing an apex of the hyperbola (B) as the determined position of the water/cement boundary.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 2 · Forward citations: 3.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗