Patents
US 2016011902 A1#13697623 Most CitedPendingUnited States (USPTO)Application

Task association analysis in application maintenance service delivery

8Forward Citations (#13697623 Global)
0.8/yrCitation Velocity (#9223632 Global)
1.65Citation PageRank (#19628457 Global)
39Prior Art Cited
0Structured Claims
0Drawings / Sheets

Abstract

Analyzing task associations may compute artifact associations for a plurality of artifacts based on historical task submission logs. From the computed artifact associations, shared artifacts that have artifact association with targeted artifacts that are associated with planned tasks, may be determined. Task association between the planned tasks may be identified based on the shared artifacts. Task associations may be analyzed to determine one or more of task assignment and task schedule for the planned tasks.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 39 · Forward citations: 8.

Claims (0)

No claim text indexed for this record.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (39)

PatentTitleYearCitations
US 5,530,861 AProcess enaction and tool integration via a task oriented paradigm1996593
US 6,023,702 AMethod and apparatus for a process and project management computer system2000217
US 6,349,287 B1Work-flow support system200234
US 2004167652 A1System for assisting planning of work allocation utilizing visual display screen—18
US 2004254820 A1Computer calculating working time group from using part group—10
US 2006047558 A1Method, system, and computer program product for assigning personnel to project tasks—46
US 2006053043 A1Enterprise project management system and method therefor—215
US 2007005413 A1Dynamic prioritization in a work management process—36
US 2007073575 A1Progress management system—52
US 2008021757 A1integrated project management and development environment for determining the time expended on project tasks—17
US 7,406,432 B1Project management over a network with automated task schedule update200850
US 2009234699 A1User Interface For Scheduling Resource Assignments—56
US 2009299782 A1Variance management—9
US 2009319323 A1Computer modeling of project management process—7
US 2010010860 A1System and method for social network routing for request matching in enterprise environments—17
US 2010131916 A1Software for modeling business tasks—74
US 2010174578 A1Interface for Project and Task Submission for Automated Delegation—38
US 2010299171 A1Summary Tasks for Top-Down Project Planning—22
US 2010305994 A1Project Management Tool—34
US 2011145034 A1Method and system for estimating project delay—22
US 2011252019 A1Project management system—7
US 2011270644 A1System and method to estimate the effects of risks on the time progression of projects—15