Patents
US 2012151402 A1#12222813 Most CitedPendingUnited States (USPTO)Application

Lifecycle Management of Enterprise Boundaries

9Forward Citations (#12222813 Global)
0.6/yrCitation Velocity (#12428153 Global)
1.52Citation PageRank (#22424421 Global)
0Prior Art Cited
0Structured Claims
0Drawings / Sheets

Abstract

An enterprise management technique is used to manage resolution or execution of a resolution. An infrastructure is selected as a given basis for an enterprise architecture, and a discrepancy, problem, need, goal or other task is identified as a resolution object, and a determination is made whether the resolution object has validity as a resolution object to be addressed by the organization. A minimum set of individuals or stakeholders is identified as a sub-group to address or execute the resolution object based at least in part on the selection. A measurement characteristic is identified and a protocol for approval of the selection is followed. The progress of the sub-group in the addressing or execution of the resolution object is monitored by monitoring the measurement characteristic.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 9.

Claims (0)

No claim text indexed for this record.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (0)

No backward patent references recorded.