Production management with multi-type kanban modeling
Abstract
Setting a plurality of reorder points for a plurality of products, the plurality of reorder points including a first reorder point and a second reorder point, the second reorder point greater than the first reorder point. Determining for one or more products, issuing one or more normal kanbans and one or more build ahead kanbans over one or more periods of time based on inventory levels and product demand. Approving for production in the current time period the one or more normal kanbans issued for the current time period. Determining if excess capacity exists to produce additional kanbans and approving for production in the current time period one or more of the build ahead kanbans in response to determining that excess capacity exists.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 9.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (9 of 9 total)
References Cited — Backward Prior Art (8)
Non-Patent Literature (2)
- Bitran, Gabriel R., and Li Chang. "A mathematical programming approach to a deterministic kanban system." Management Science 33.4 (1987): 427-441.
- Zhou, Li, et al. "Dynamic performance of a hybrid inventory system with a Kanban policy in remanufacturing process." Omega 34.6 (2006): 585-598.