Patents
US 2010141204 A1#519958 Most CitedPendingUnited States (USPTO)Application

Sub-network load management for use in recharging vehicles equipped with electrically powered propulsion systems

68Forward Citations (#519958 Global)
4.2/yrCitation Velocity (#406422 Global)
9.15Citation PageRank (#1228983 Global)
10Prior Art Cited
0Structured Claims
0Drawings / Sheets

Abstract

The E-Grid Sub-Network Load Manager operates to regulate the demands presented by the vehicles to the associated Sub-Network thereby to spread the load presented to the service disconnect over time to enable the controllable charging of a large number of vehicles. The load management can be implemented by a number of methodologies, including: queuing requests and serving each request in sequence until satisfaction; queuing requests and cycling through the requests, partially serving each request, then proceeding to the next until the cyclic partial charging service has satisfied all requests; ordering requests pursuant to a percentage of recharge required measurement; ordering requests on an estimated connection time metric; ordering requests on a predetermined level of service basis; and the like. It is evident that a number of these methods can be concurrently employed thereby to serve all of the vehicles in the most efficient manner that can be determined.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 68.

Claims (0)

No claim text indexed for this record.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗