US 2009321069 A1#5019432 Most CitedPendingUnited States (USPTO)Application
System and method for connecting multiple stage completions
18Forward Citations (#5019432 Global)
1.1/yrCitation Velocity (#6064418 Global)
2.35Citation PageRank (#11215628 Global)
19Prior Art Cited
0Structured Claims
0Drawings / Sheets
Abstract
A technique is provided to facilitate connection of multiple stage completions. A first completion stage is deployed at a wellbore location. Subsequently, the next completion stage is moved downhole into engagement with the first completion stage. The completion stages each have communication lines that are coupled together downhole via movement of the completion stages into engagement.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 18.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗