Operating Time Reducing Method, Operating Time Reducing Apparatus, Program and Component Mounter
Abstract
An operating time reducing method in which a processing procedure of a component mounting order determination method can be changed depending on the type of an operation loss that affects a component mounting time for mounting components onto the board is an operating time reducing method for a component mounter, wherein the method includes: an operation loss identifying step (S 22 to S 26 , S 30 , S 34 to S 38 , S 42 to S 46 ) of identifying an operation loss to be resolved in the component mounter; a processing procedure selecting step (S 28 , S 32 , S 40 , S 48 , S 50 , S 52 ) of selecting, based on the identified operation loss, a processing procedure for reducing an operating time of the component mounter; and a processing procedure executing step (S 28 , S 32 , S 40 , S 48 , S 50 , S 52 ) of executing the selected processing procedure.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 40.
Claims (0)
No claim text indexed for this record.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗