US 12,801,983 B2#3072431 Most CitedActiveUnited States (USPTO)Utility

Thermal predictive modeling of physical assets

0Forward Citations (#3072431 Global)
0.0/yrCitation Velocity (#3072431 Global)
0.00Citation PageRank (#3072431 Global)
7Prior Art Cited
20Claims (3 Indep. · 17 Dep.)
6Drawings / Sheets

Abstract

A method is provided that includes receiving time constants and trained regression model(s) determined during a training phase, receiving real-time measured current used by the asset; receiving real-time measured temperatures measured at essential monitoring points; predicting temperature for prediction points in real time by applying the trained regression model(s) using the real-time measured current, previously predicted temperatures for the prediction points, time lapse since the previously predicted temperatures were predicted, and the time constants, wherein the prediction points are selectable to include both prediction points that are the same as and are different from the essential monitoring points; comparing the predicted temperatures for a subset of the prediction points with currently received temperatures for the essential monitoring points that correspond to the subset of the prediction points; correcting the predicted temperatures for the selected prediction points using a result of the comparison; and outputting the predicted temperatures in real time.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 0.

Claims (20 — 3 Independent, 17 Dependent)

  1. Claim 1Independent Claim

    A method, comprising: training, during a training phase, at least one regression model by applying machine learning to multi-dimensional simulation points of a simulation simulating an asset and temperatures associated with the respective simulation points; repeating, during the training phase, a steady-state loop process until a steady-state prediction is determined to be acceptable, wherein the steady-state loop process comprises extracting, for the simulation, steady-state simulation points of the simulation points and a temperature associated with each of the steady-state simulation points; receiving time constants and the at least one trained-regression model determined during the training phase; receiving real-time measured current used by the asset; receiving real-time measured temperatures measured via sensors at essential monitoring points of the asset, wherein the essential monitoring points include thermally conductive surfaces of the asset on which the sensors are and/or locations at which discrete portions of the thermally conductive surfaces are within a field of view of the sensors; predicting temperature for prediction points of the asset in real time to generate predicted temperatures by applying the at least one regression model and using the real-time measured current, previously predicted temperatures for the prediction points, a time lapse since the previously predicted temperatures were predicted, and the time constants, wherein the prediction points are selectable to include selected prediction points having same prediction points as the essential monitoring points and different prediction points than the essential monitoring points, wherein the same prediction points correspond to accessible zones of the asset that are accessible to the sensors, and wherein the different prediction points correspond to inaccessible zones of the asset that are inaccessible to the sensors; performing a comparison of the predicted temperatures for a subset of the prediction points with currently received temperatures for the essential monitoring points that correspond to the subset of the prediction points; correcting the predicted temperatures for the selected prediction points to generate corrected predicted temperatures using a result of the comparison; and outputting the corrected predicted temperatures in real time, wherein the corrected predicted temperatures represent thermal conditions in both the accessible zones of the asset and the inaccessible zones of the asset.

  2. Claim 2Depends on #1

    The method of claim 1, further comprising updating an augmented reality visualization of the asset in real time using the corrected predicted temperatures.

  3. Claim 3Depends on #1

    The method of claim 1, further comprising: determining whether a difference between the predicted temperatures for the subset of the prediction points and the currently received temperatures at the corresponding essential monitoring points exceeds a threshold; and triggering an action to affect the asset in response to determining that the difference exceeds the threshold.

  4. Claim 4Depends on #1

    The method of claim 1, wherein the time constants are associated with respective clusters of the simulation points, wherein each of the simulation points includes a location of the asset that is simulated and a simulated temperature at the location of the asset, and wherein the at least one regression model is determined from the respective clusters of the simulation data.

  5. Claim 5Depends on #1

    The method of claim 1, wherein the at least one regression model includes a steady-state regression model that uses polynomial regression and a transient-state regression model that uses exponential regression, and wherein predicting the temperature for the prediction points comprises: predicting steady-state temperatures at the prediction points to generate predicted steady-state temperatures by applying the steady-state regression model; and predicting transient-state temperatures at the prediction points to generate predicted transient-state temperatures by applying the transient-state regression model using the predicted steady-state temperatures at the prediction points, the real time measured current, previously predicted transient-state temperatures for the prediction points, the time lapse, and the time constants, wherein the predicted temperature for the prediction points in real time includes the predicted transient-state temperatures.

  6. Claim 6Depends on #1

    The method of claim 1, wherein the simulation is a digital twin based on a physical replica of the asset simulated by the simulation, and wherein the digital twin employs evolving data associated with the asset to represent real-time changes to the asset over time.

  7. Claim 7Depends on #1

    The method of claim 1, wherein the simulation includes two or more steady-state simulations using different simulation parameters, and wherein the steady-state loop process further comprises: extracting, for the two or more steady-state simulations, the steady-state simulation points of the simulation points and the temperature associated with each of the steady-state simulation points; applying, for each of the two or more steady-state simulations, a clustering algorithm to the steady-state simulation points and their respective associated temperatures to form a plurality of steady-state clusters; applying a steady-state regression model to each of the steady-state clusters to represent a relationship between the temperatures associated with the respective steady-state simulation points and the simulation parameters; generating the steady-state prediction by applying the steady-state regression model to selected simulation parameters for predicting steady-state temperatures of the steady-state simulation points at the selected simulation parameters; determining a steady-state difference between the predicted steady-state temperatures of the steady-state simulation points and measured temperatures at a plurality of corresponding monitoring points of the asset, wherein the steady-state prediction is determined to be acceptable when the steady-state difference is below a steady-state threshold; and adjusting for use with a next repetition, if any, the selected simulation parameters to attempt to reduce the steady-state difference.

  8. Claim 8Depends on #7

    The method of claim 7, wherein the simulation includes a transient-state simulation, and wherein the method further comprises, during the training phase: extracting transient-state simulation points of the simulation points and temperatures associated with each of the transient-state simulation points for a plurality of spaced time steps; applying the clustering algorithm to the transient-state simulation points across the plurality of spaced time steps and their temperatures to form a plurality of transient-state clusters; and repeating a transient-state loop process until a transient-state prediction is determined to be acceptable, wherein the transient-state loop process comprises: applying a transient-state regression model to each of the transient-state clusters using a most recent time constant associated with each of the transient-state clusters; generating the transient-state prediction for predicting a latest temperature associated with respective transient-state clusters by applying the transient-state regression model, wherein the transient-state regression model is applied using; the steady-state prediction once it is determined to be acceptable, a previously predicted transient-state temperature for the respective transient-state clusters obtained at an earlier simulated time, an amount of simulated time elapsed since the earlier simulated time, and the most recent time constant for the corresponding transient-state cluster; determining a transient-state difference between the predicted transient-state temperatures of the transient-state simulation points and the measured temperatures at the plurality of corresponding monitoring points of the asset, wherein the transient-state prediction is determined to be acceptable when the transient-state difference is below a transient-state threshold; and adjusting for use with a next repetition, if any, the time constant to attempt to reduce the transient-state difference.

  9. Claim 9Depends on #8

    The method of claim 8, further comprising updating an augmented reality visualization of the asset in real time using at least one of the transient-state prediction or the steady-state prediction.

  10. Claim 10Depends on #8

    The method of claim 8, further comprising: obtaining the measured temperatures at the plurality of corresponding monitoring points; and continually updating the measured temperatures with measurements obtained at a subset of the monitoring points for use when determining the transient-state difference.

  11. Claim 11Independent Claim

    A thermal monitoring system for predicting temperatures, the thermal monitoring system comprising: a memory configured to store instructions; and at least one processing device in communication with the memory, wherein the at least one processing device upon execution of the instructions is configured to: train, during a training phase, at least one regression model by applying machine learning to multi-dimensional simulation points of a simulation simulating an asset and temperatures associated with the respective simulation points; repeat, during the training phase, a steady-state loop process until a steady-state prediction is determined to be acceptable, wherein the steady-state loop process comprises extracting, for the simulation, steady-state simulation points of the simulation points and a temperature associated with each of the steady-state simulation points; receive time constants and the at least one regression model determined during the training phase; receive real-time measured current used by the asset; receive real-time measured temperatures measured via sensors at essential monitoring points of the asset, wherein the essential monitoring points include thermally conductive surfaces of the asset on which the sensors are and/or locations at which discrete portions of the thermally conductive surfaces are within a field of view of the sensors; predict temperature for prediction points of the asset in real time to generate predicted temperatures by applying the at least one regression model and using the real-time measured current, previously predicted temperatures for the prediction points, a time lapse since the previously predicted temperatures were predicted, and the time constants, wherein the prediction points are selectable to include selected predicted points having same prediction points as the essential monitoring points and different prediction points than the essential monitoring points, wherein the same prediction points correspond to accessible zones of the asset that are accessible to the sensors, and wherein the different prediction points correspond to inaccessible zones of the asset that are inaccessible to the sensors; perform a comparison of the predicted temperatures for a subset of the prediction points with currently received temperatures for the essential monitoring points that correspond to the subset of the prediction points; correct the predicted temperatures for the selected prediction points to generate corrected predicted temperatures using a result of the comparison; and output the corrected predicted temperatures in real time, wherein the corrected predicted temperatures represent thermal conditions in both the accessible zones of the asset and the inaccessible zones of the asset.

  12. Claim 12Depends on #11

    The thermal monitoring system of claim 11, wherein the at least one processing device upon execution of the instructions is further configured to update an augmented reality visualization of the asset in real time using the corrected predicted temperatures, and wherein correcting the predicted temperatures comprises applying a correction formula that uses a difference between a predicted temperature for a prediction point and a currently received temperature for an essential monitoring point corresponding to the prediction point.

  13. Claim 13Depends on #11

    The thermal monitoring system of claim 11, wherein the at least one processing device upon execution of the instructions is further configured to: determine whether a difference between the predicted temperatures for the subset of the prediction points and the currently received temperatures at the corresponding essential monitoring points exceeds a threshold; and cause an action to be performed that affects the asset in response to determining that the difference exceeds the threshold.

  14. Claim 14Depends on #11

    The thermal monitoring system of claim 11, wherein the time constants are associated with respective clusters of the simulation points, and wherein the at least one regression model is determined from the respective clusters of the simulation data.

  15. Claim 15Depends on #11

    The thermal monitoring system of claim 11, wherein the at least one regression model includes a steady-state regression model that uses polynomial regression and a transient-state regression model that uses exponential regression, and wherein predicting the temperature for the prediction points comprises: predicting steady-state temperatures at the prediction points to generate predicted steady-state temperatures by applying the steady-state regression model; and predicting transient-state temperatures at the prediction points to generate predicted transient-state temperatures by applying the transient-state regression model using the predicted steady-state temperatures at the prediction points, the real time measured current, previously predicted transient-state temperatures for the prediction points, the time lapse, and the time constants, wherein the predicted temperature for the prediction points in real time includes the predicted transient-state temperatures.

  16. Claim 16Depends on #11

    The thermal monitoring system of claim 11, wherein the simulation includes two or more steady-state simulations using different simulation parameters, wherein the two or more steady-state simulations include a first steady-state simulation using a first simulation of at least two different electrical currents while the asset being simulated is at equilibrium, and wherein during the training phase, the at least one processing device upon execution of the instructions is further configured to repeat the steady-state loop process until the steady-state prediction is determined to be acceptable.

  17. Claim 17Depends on #16

    The thermal monitoring system of claim 16, wherein the steady-state loop process comprises: extracting, for the two or more steady-state simulations, steady-state simulation points of the simulation points and a temperature associated with each of the steady-state simulation points; applying, for each of the two or more steady-state simulations, a clustering algorithm to the extracted steady-state simulation points and their respective, associated temperatures to form a plurality of steady-state clusters; applying a steady-state regression model to each of the steady-state clusters to represent a relationship between the temperatures associated with the respective steady-state simulation points and the simulation parameters; generating the steady-state prediction by applying the steady-state regression model to selected simulation parameters for predicting steady-state temperatures of the steady-state simulation points at the selected simulation parameters; determining a steady-state difference between the predicted steady-state temperatures of the steady-state simulation points and measured temperatures at a plurality of corresponding monitoring points of the asset, wherein the steady-state prediction is determined to be acceptable when the steady-state difference is below a steady-state threshold; and adjusting for use with a next repetition, if any, the selected simulation parameters to attempt to reduce the steady-state difference.

  18. Claim 18Depends on #11

    The thermal monitoring system of claim 11, wherein the simulation includes a transient-state simulation, and wherein during the training phase, the at least one processing device upon execution of the instructions is further configured to: extract transient-state simulation points of the simulation points and temperatures associated with each of the transient-state simulation points for a plurality of spaced time steps; apply a clustering algorithm to the extracted transient-state simulation points across the plurality of spaced time steps and their temperatures to form a plurality of transient-state clusters; and repeat a transient-state loop process until a transient-state prediction is determined to be acceptable.

  19. Claim 19Depends on #18

    The thermal monitoring system of claim 18, wherein the transient-state loop process comprises: applying a transient-state regression model to each of the transient-state clusters using a most recent time constant associated with each of the transient-state clusters; generating the transient-state prediction for predicting a latest temperature associated with respective transient-state clusters by applying the transient-state regression model using the steady-state prediction once it is determined to be acceptable, a previously predicted transient-state temperature for the respective transient-state clusters obtained at an earlier simulated time, an amount of simulated time elapsed since the earlier simulated time, and the most recent time constant for the corresponding transient-state cluster; determining a transient-state difference between the predicted transient-state temperatures of the transient-state simulation points and the measured temperatures at the plurality of corresponding monitoring points of the asset, wherein the transient-state prediction is determined to be acceptable when the transient-state difference is below a transient-state threshold; and adjusting for use with a next repetition, if any, the time constant to attempt to reduce the transient-state difference.

  20. Claim 20Independent Claim

    A non-transitory computer readable medium comprising instructions executable by a processor to perform a method, the method comprising: training, during a training phase, at least one regression model by applying machine learning to multi-dimensional simulation points of a simulation simulating an asset and temperatures associated with the respective simulation points; repeating, during the training phase, a steady-state loop process until a steady-state prediction is determined to be acceptable, wherein the steady-state loop process comprises extracting, for the simulation, steady-state simulation points of the simulation points and a temperature associated with each of the steady-state simulation points; receiving time constants and the at least one regression model determined during the training phase; receiving real-time measured current used by the asset; receiving real-time measured temperatures measured via sensors at essential monitoring points of the asset, wherein the essential monitoring points include thermally conductive surfaces of the asset on which the sensors are and/or locations at which discrete portions of the thermally conductive surfaces are within a field of view of the sensors; predicting temperature for prediction points of the asset in real time to generate predicted temperatures by applying the at least one regression model and using the real-time measured current, previously predicted temperatures for the prediction points, a time lapse since the previously predicted temperatures were predicted, and the time constants, wherein the prediction points are selectable to include selected prediction points having same prediction points as the essential monitoring points and different prediction points than the essential monitoring points, wherein the same prediction points correspond to accessible zones of the asset that are accessible to the sensors, and wherein the different prediction points correspond to inaccessible zones of the asset that are inaccessible to the sensors; performing a comparison of the predicted temperatures for a subset of the prediction points with currently received temperatures for the essential monitoring points that correspond to the subset of the prediction points; correcting the predicted temperatures for the selected prediction points to generate corrected predicted temperatures using a result of the comparison; and outputting the corrected predicted temperatures in real time, wherein the corrected predicted temperatures represent thermal conditions in both the accessible zones of the asset and the inaccessible zones of the asset.

Technical Overview & Description

TECHNICAL FIELD The present disclosure relates to health monitoring a physical asset, and more particularly, to applying machine learning for thermal predictive modeling of an industrial physical asset. BACKGROUND Thermal monitoring systems can identify thermal changes in equipment located in an environment, such as an industrial environment, a vehicle, an appliance, data processing center, or other mechanical environments. Thermal changes can be indicators of potential safety, functional or process problems, and/or the need for maintenance intervention in equipment. Effective thermal monitoring can be used to detect an issue before it develops into a safety risk or affects functionality or productivity of the equipment monitored. A thermal monitoring system uses sensors placed on thermally conductive surfaces of a physical asset. The sensors are placed in discrete locations that are accessible on the asset for placement of the sensors or within a field of view of the sensors. Locations of the asset that are not physically accessible cannot be monitored by the sensors. Accordingly, real time thermal monitoring using the sensors is limited to monitoring of discrete, physically accessible locations. Potentially critical information related to locations other than the discrete locations accessible to the sensors, including inaccessible locations, is not available to or used by the thermal monitoring system. Accordingly, if a safety alert system, maintenance system, and/or optimization system uses data from the thermal monitoring system to make decisions in real time, the decisions can be made on incomplete data. While conventional methods and systems have generally been considered satisfactory for their intended purpose, there is still a need in the art for a method of real time thermal monitoring of locations other than discrete locations that can be accessed by the sensors, including a continuum of real time thermal monitoring over accessible and/or inaccessible ther

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

Non-Patent Literature (1)

  • International Search Report and Written Opinion for PCT Patent Application No. PCT/US2023/086246,mailed on May 23, 2024.