Identifying relevance of process inputs
Abstract
Computing an input relevance measure of process inputs by obtaining from a sensor array sensor measurements that relate process inputs to a process output, computing from the sensor measurements, a number of data partitions, building for each data partition of the number of data partitions a corresponding stochastic gradient boosting model, and computing for each process input, a number of partial dependency plots with each partial dependency plot being based on the corresponding stochastic gradient boosting model. The input relevance measure is then computed for each process input based on the number of partial dependency plots of the process input to estimate a degree of change in the process output obtained by varying the process input.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 0.
Claims (20 — 3 Independent, 17 Dependent)
- Claim 1Independent Claim
A computer-implemented method for identifying relevance of a plurality of process inputs of an industrial process, the method comprising: obtaining, by a sensor recommender system from a sensor array, a plurality of sensor measurements that relate the plurality of process inputs to a process output; computing from the plurality of sensor measurements, a first number of random data partitions that are different from one another; building for each random data partition of the first number of random data partitions a corresponding stochastic gradient boosting model; computing for each process input of the plurality of process inputs, a first number of partial dependency plots, each of the first number of partial dependency plots being generated based on a respective one of the corresponding stochastic gradient boosting models; and computing for each process input of the plurality of process inputs, based on the first number of partial dependency plots of the process input, an input relevance measure that estimates a degree of change in the process output obtained by varying the respective process input, wherein the input relevance measure is computed by computing a difference between a maximum confirmed process output and a minimum confirmed process output determined from the first number of partial dependency plots; and selecting, based on the input relevance measures, one or more sensors of the plurality of sensors having a corresponding input relevance measure that exceeds a predetermined threshold, and monitoring, in real time, the one or more selected sensors and adjusting at least one of the plurality of process inputs in response to the one or more monitored sensors to maintain the process output within a predetermined operating limit.
- Claim 2Depends on #1
The method of claim 1, further comprising: discarding one or more process inputs with a zero or negative input relevance measure.
- Claim 3Depends on #1
The method of claim 1, further comprising: computing by the sensor recommender system, one or more sensors of the sensor array that influence the process output by determining sensors with a corresponding input relevance measure greater than zero.
- Claim 4Depends on #1
The method of claim 1, further comprising: computing by the sensor recommender system, one or more sensors of the sensor array that influences the process output by at least a predetermined degree.
- Claim 5Depends on #1
The method of claim 1, wherein the plurality of sensor measurements include process input sensor measurements and process output sensor measurements.
- Claim 6Depends on #1
The method of claim 1, wherein the first number of random data partitions is from 10-100.
- Claim 7Depends on #1
The method of claim 1, wherein the computing of the input relevance measure is performed automatically by the sensor recommender system.
- Claim 8Depends on #1
The method of claim 1, wherein the maximum confirmed process output is computed as a maximum, over a range of values of a corresponding process input, of minimum values of the first number of partial dependency plots.
- Claim 9Depends on #8
The method of claim 8, wherein the minimum confirmed process output is computed as a minimum, over the range of values of the corresponding process input, of maximum values of the first number of partial dependency plots.
- Claim 10Independent Claim
A system for identifying relevance of a plurality of process inputs of an industrial process, the system comprising: a sensor array; and a processor of a sensor recommender system, the processor being configured to: obtain, by the sensor recommender system from the sensor array, a plurality of sensor measurements that relate the plurality of process inputs to a process output; create from the plurality of sensor measurements, a first number of random data partitions that are different from one another; build for each random data partition of the first number of random data partitions a corresponding stochastic gradient boosting model; compute for each process input of the plurality of process inputs, a first number of partial dependency plots, each of the plurality of partial dependency plots being generated based on a respective one of the corresponding stochastic gradient boosting models; and compute, for each process input of the plurality of process inputs, based on the first number of partial dependency plots of the process input, an input relevance measure that estimates a degree of change in the process output obtained by varying the respective process input, wherein the input relevance measure is computed by computing a difference between a maximum confirmed process output and a minimum confirmed process output determined from the first number of partial dependency plots; and select, based on the input relevance measures, one or more sensors of the plurality of sensors having a corresponding input relevance measure that exceeds a predetermined threshold, and monitor, in real time, the one or more selected sensors and adjust at least one of the plurality of process inputs in response to the one or more monitored sensors to maintain the process output within a predetermined operating limit.
- Claim 11Depends on #10
The system of claim 10, wherein the processor is further configured to: discard one or more process inputs with a zero or negative input relevance measure.
- Claim 12Depends on #10
The system of claim 10, wherein the processor is further configured to: compute by the sensor recommender system, one or more sensors of the sensor array that influence the process output by determining sensors with a corresponding input relevance measure greater than zero.
- Claim 13Depends on #10
The system of claim 10, wherein the processor is further configured to: compute by the sensor recommender system, one or more sensors of the sensor array that influences the process output by at least a predetermined degree.
- Claim 14Depends on #10
The system of claim 10, wherein the plurality of sensor measurements include process input sensor measurements and process output sensor measurements.
- Claim 15Depends on #10
The system of claim 10, wherein the processor is further configured to automatically compute the input relevance measure.
- Claim 16Depends on #10
The system of claim 10, wherein the processor is further configured to compute the maximum confirmed process output as a maximum, over a range of values of a corresponding process input, of minimum values of the first number of partial dependency plots.
- Claim 17Depends on #16
The system of claim 16, wherein the processor is further configured to compute the minimum confirmed process output as a minimum, over the range of values of the corresponding process input, of maximum values of the first number of partial dependency plots.
- Claim 18Independent Claim
A non-transitory computer-readable storage medium storing a program which, when executed by a computer system, causes the computer system to: obtain, by a sensor recommender system from a sensor array a plurality of sensor measurements that relate a plurality of process inputs of an industrial process to a process output; create from the plurality of sensor measurements, a first number of random data partitions that are different from one another; build, for each random data partition of the first number of random data partitions, a corresponding stochastic gradient boosting model; compute for each process input of the plurality of process inputs, a first number of partial dependency plots of the process input, each of the plurality of partial dependency plots being generated based on a respective one of the corresponding stochastic gradient boosting model; and compute for each process input of the plurality of process inputs, based on the first number of partial dependency plots of the process input, an input relevance measure that estimates a degree of change in the process output obtained by varying the respective process input, wherein the input relevance measure is computed by computing a difference between a maximum confirmed process output and a minimum confirmed process output determined from the first number of partial dependency plots; and select, based on the input relevance measures, one or more sensors of the plurality of sensors having a corresponding input relevance measure that exceeds a predetermined threshold, and monitor, in real time, the one or more selected sensors and adjust at least one of the plurality of process inputs in response to the one or more monitored sensors to maintain the process output within a predetermined operating limit.
- Claim 19Depends on #18
The non-transitory computer-readable storage medium of claim 18, wherein the plurality of sensor measurements include process input sensor measurements and process output sensor measurements.
- Claim 20Depends on #18
The non-transitory computer-readable storage medium of claim 18, wherein the maximum confirmed process output is computed as a maximum, over a range of values of a corresponding process input, of minimum values of the first number of partial dependency plots, and wherein the minimum confirmed process output is computed as a minimum, over the range of values of the corresponding process input, of maximum values of the first number of partial dependency plots.
Technical Overview & Description
BACKGROUND Technical Field The present disclosure generally relates to identifying the relevance of process inputs, and more particularly, to computing the relevance of inputs tracked by sensors in a system to identify an importance of each sensor in the sensor array and how the sensor affects the process output. Description of the Related Art Predictive models may be used to analyze existing systems and processes and make prediction about future outcomes. The predictive models may be generated using collected and aggregated observations to make predictions. One or more dependent (output or response) variables and numerous independent (input or explanatory) variables may be present in a collection of observations. One or more of the independent variables may have more influence on the dependent variable than the remaining independent variables. BRIEF SUMMARY According to an embodiment of the present disclosure, a method is disclosed. The method comprises computing an input relevance measure of process inputs by obtaining from a sensor array sensor measurements that relate process inputs to a process output, computing from the sensor measurements, a number of data partitions, building for each data partition of the number of data partitions a corresponding stochastic gradient boosting model, and computing for each process input, a number of partial dependency plots with each partial dependency plot being based on the corresponding stochastic gradient boosting model. The input relevance measure is then computed for each process input based on the number of partial dependency plots of the process input to estimate a degree of change in the process output obtained by varying the process input. In an aspect, process inputs with a zero or negative input relevance measure may be discarded. In one aspect, the input relevance measure is computed from the number of partial dependency plots by computing a difference between a maximum confirmed process output of the number of p
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (9)
Non-Patent Literature (1)
- Bikmukhametov et al. (Combining Machine Learning and Process Engineering Physics Towards Enhanced Accuracy and Explainability of Data-Driven Models, published 2020) (Year: 2020).