Electric power systems, control systems and associated operational methods
Abstract
Electric power systems, control systems and associated operational methods are described. According to one aspect, an electric power system includes plural load controllers that are configured to control the supply of electrical energy from the system to plural loads, a control system that determines an amount of power in reserve and available to be provided to the electric power system, uses the determined amount of power in reserve to determine different values for a plurality of setpoints that correspond to a parameter of electrical energy that is supplied by the system to the loads, and the load controllers monitor the parameter of the electrical energy that is supplied by the system with respect to the setpoint values and to adjust an amount of the electrical energy that is supplied from the electric power system to the loads as a result of the monitoring of the parameter by the load controllers.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 0.
Claims (8)
- Claim 1Independent Claim
An electric power system comprising: a plurality of load controllers that are configured to control the supply of electrical energy from the electric power system to a plurality of loads; a control system configured to: determine an amount of power in reserve and available to be provided to the electric power system; and use the determined amount of power in reserve to determine a plurality of different values of a plurality of setpoints, wherein the setpoints correspond to a parameter of the electrical energy that is supplied by the electric power system to the loads; and wherein the load controllers are configured to monitor the parameter of the electrical energy that is supplied by the electric power system with respect to the values of the setpoints and to adjust an amount of power that is supplied from the electric power system to the loads as a result of the monitoring of the parameter of the electrical energy by the load controllers; and wherein the control system is configured
- Claim 2Depends on #1
The electric power system of claim 1 wherein the control system is configured to determine the values of the setpoints at an initial moment in time, to determine an amount of power in reserve and available to be provided to the electric power system at a plurality of additional moments in time, and to determine additional values of the setpoints at the additional moments in time.
- Claim 3Depends on #2
The electric power system of claim 2 wherein the additional values of the setpoints configure the load controllers to supply different amounts of power to the loads at different moments in time for a given value of the parameter of the electrical energy.
- Claim 4Depends on #1
The electric power system of claim 1 wherein one of the load controllers is configured to monitor the parameter of the electrical energy that is supplied by the electric power system with respect to different ones of the values of the setpoints at different moments in time.
- Claim 5Depends on #1
The electric power system of claim 1 wherein the determined amount of power in reserve is in addition to an amount of power that is supplied by the electric power system to the loads at a given moment in time.
- Claim 6Depends on #1
The electric power system of claim 1 wherein the load controllers are configured to reduce the amount of power that is supplied from the electric power system to the loads to adjust the amount of power.
- Claim 7Depends on #1
The electric power system of claim 1 wherein the determined amount of power in reserve is greater at a first moment in time compared with a second moment in time, and the determined values of the setpoints configure the load controllers to increase a reduction in the amount of power that is supplied from the electric power system to the loads for a given value of the parameter of the electrical energy at the second moment in time compared with a reduction in the amount of power that is supplied from the electric power system to the loads for the given value of the parameter of the electrical energy at the first moment in time.
- Claim 8Depends on #1
The electric power system of claim 1 wherein the control system is configured to use the determined amount of power in reserve to select one of a plurality of response curves and to use the selected response curve to determine the values of the setpoints.
Technical Overview & Description
RELATED PATENT DATA This application claims the benefit of U.S. Provisional Patent Application Serial No. 63/322,819, filed Mar. 23, 2022, titled “ Distributed Control Architecture to Engage End-Use Loads (GFAS) as a Flexible Operating Resource in Primary Frequency Resource, ” the disclosure of which is incorporated herein by reference. STATEMENT AS TO RIGHTS TO INVENTIONS MADE UNDER FEDERALLY-SPONSORED RESEARCH AND DEVELOPMENT This invention was made with Government support under Contract DE-AC05-76RL01830 awarded by the U.S. Department of Energy. The Government has certain rights in the invention. TECHNICAL FIELD This disclosure relates to electric power systems, control systems and associated operational methods. BACKGROUND OF THE DISCLOSURE Distribution systems of electric power systems around the world are experiencing rapid change due to the accelerating deployment of distributed energy resources (DERs), control technologies, changing business models, and regulatory policies. These changes are transforming distribution system planning and operations as systems move from being passive and static to active and dynamic. Microgrids and networks of microgrids represent an example of an active and dynamic technology being deployed at the distribution level. Microgrid technologies have existed since the earliest industrial electric power systems, but the rate of their deployment is accelerating due to improved inverter controls and distributed control architectures. As a result of distribution systems becoming more active and dynamic, it is not always practical to use traditional controls that rely on static system conditions. A simple example of this is the mis-operation of legacy tap changing voltage regulators when power flow direction is reversed. Regardless of whether the reversal of power flow is due to a topological reconfiguration or changes in output of distributed energy resources (DERs), it can result in the voltage regulator operating to the end tap limit
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (3)
| Patent | Title | Year | Citations |
|---|
Non-Patent Literature (10)
- Cao et al.,
- “
- A Risk-Averse Conic Model for Networked Microgrids Planning with Reconfiguration and Reorganizations
- ”
- , IEEE Transactions on Smart Grid, vol. 11, No. 1, Jan. 2020, United States, pp. 696-709.
- Chen et al.,
- “
- Networked Microgrids for Grid Resilience, Robustness, and Efficiency: A Review
- ”
- , IEEE Transactions on Smart Grid, vol. 12, No. 1, 2020, United States, 15 pages.