hottub.patents
US 12,749,033 B2#3125031 Most CitedActiveUnited States (USPTO)Utility

Flexible work breakdown structure

0Forward Citations (#3125031 Global)
0.0/yrCitation Velocity (#3125031 Global)
0.00Citation PageRank (#3125031 Global)
9Prior Art Cited
8Claims (1 Indep. · 7 Dep.)
0Drawings / Sheets

Abstract

Improved software technology and techniques for enabling creation and management of a customized work breakdown structure ( “ WBS ” ) for a specific project may comprise various phases. For instance, a first phase may involve defining an organization-level WBS comprising a first set of customized, multi-dimensional WBS codes that serve as a starting point for the WBS codes to use for projects being handled by the organization, a second phase may involve defining a project-level WBS comprising a second set of customized, multi-dimensional WBS codes to use for a particular project being handled by the organization, and a third phase may involve using the defined project-level WBS to manage certain aspects of the particular project. Further, access to customize WBS variables may be regulated based on user access permissions information indicated by an organization and/or project-level WBS.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 0.

Claims (8 — 1 Independent, 7 Dependent)

  1. Claim 1Independent Claim

    A computing platform comprising: a network interface; at least one processor; a non-transitory computer-readable medium; and program instructions stored on the non-transitory computer-readable medium that, when executed by the at least one processor, cause the computing platform to: receive, from a first client station associated with a first user, a request to create a project-level Work Breakdown Structure ( “ WBS ”) for a given construction project; based on receiving the request to create the project-level WBS for the given construction project: generate (i) an initial version of a WBS code structure for the project-level WBS that comprises a sequence of two or more WBS variables that are concatenated together, and (ii) respective initial sets of available values for WBS variables in the sequence of two or more WBS variables, wherein the initial version of the WBS code structure for the project-level WBS has a set of one or more access-control provisions for restricting what modifi

  2. Claim 2Depends on #1

    The computing platform of claim 1, wherein the given construction project is associated with a given organization, the computing platform further comprising program instructions stored on the non-transitory computer-readable medium that, when executed by the at least one processor, cause the computing platform to: before receiving the request to create the project-level WBS for the given construction project, receive, from a second client station associated with a second user, a request to create an organization-level WBS for projects associated with the given organization; and create the organization-level WBS, wherein the initial version of the WBS code structure for the project-level WBS and the respective initial sets of available values for the WBS variables in the sequence of two or more WBS variables are generated based on the organization-level WBS.

  3. Claim 3Depends on #2

    The computing platform of claim 2, further comprising program instructions stored on the non-transitory computer-readable medium that, when executed by the at least one processor, cause the computing platform to: receive access permission data for the organization-level WBS, wherein the set of one or more access-control provisions for restricting what modifications to the initial version of the WBS code structure are permitted is based on the access permission data.

  4. Claim 4Depends on #1

    The computing platform of claim 1, further comprising program instructions stored on the non-transitory computer-readable medium that, when executed by the at least one processor, cause the computing platform to: before assigning the given WBS code to the given line item: receive, from a second client station associated with a second user, a request to use the project-level WBS to assign the given WBS code to the given line item; and cause the second client station to dynamically update a display of the second client station to present a second GUI that enables the second user to input a user selection of the given WBS code to assign to the given line item, wherein the given WBS code is thereafter assigned to the given line item based on the user selection.

  5. Claim 5Depends on #4

    The computing platform of claim 4, wherein the second user is the first user.

  6. Claim 6Depends on #4

    The computing platform of claim 4, further comprising program instructions stored on the non-transitory computer-readable medium that, when executed by the at least one processor, cause the computing platform to: receive access permission data that defines permissions for accessing the set of available WBS codes for the given construction project; and based on the access permission data, determine that the second user is authorized to access a subset of available WBS codes in the set of available WBS codes for the given construction project, wherein the given WBS code that is assigned to the given line item is included in the subset of the available WBS codes that the second user is authorized to access.

  7. Claim 7Depends on #1

    The computing platform of claim 1, further comprising program instructions stored on the non-transitory computer-readable medium that, when executed by the at least one processor, cause the computing platform to: assign, to the given line item, one or more of (i) an actual expenditure amount associated with the given construction project, or (ii) a budget amount associated with the given construction project.

  8. Claim 8Depends on #1

    The computing platform of claim 1, wherein the program instructions that, when executed by the at least one processor, cause the computing platform to generate the initial version of the WBS code structure for the project-level WBS comprise program instructions that, when executed by the at least one processor, cause the computing platform to: generate the initial version of the WBS code structure for the project-level WBS based on one or more of (i) an analysis of WBS variables that were used for other construction projects associated with the first user, (ii) an analysis of WBS variables used for other construction projects that are determined to be similar to the given construction project, or (iii) a standard project-level template used for a type of construction project.

Technical Overview & Description

CROSS-REFERENCE TO RELATED APPLICATIONS This application is a continuation of U.S. application Ser. No. 18/336,613, filed on Jun. 16, 2023, and titled “ Flexible Work Breakdown Structure, ” which is a continuation of U.S. application Ser. No. 17/472,963, filed on Sep. 13, 2021, and titled “ Flexible Work Breakdown Structure, ” which is a continuation of U.S. application Ser. No. 16/395,016, filed on Apr. 25, 2019, issued as U.S. Pat. No. 11,120,376, and titled “ Flexible Work Breakdown Structure, ” the contents of each of which are incorporated by reference herein in their entirety. BACKGROUND Managing a project to completion is a complex endeavor. Indeed, a highly-involved project, such as a construction project, may include various phases to move the project toward completion. For example, a construction project may include a planning phase to allocate the project's budget by providing cost estimates for the labor, equipment, and materials, which may be used to monitor and control cost expenditures during the construction project. A construction project may also include a procurement phase to hire labor (e.g., subcontractors, on-site workers) and procure equipment and materials for the project, and an execution phase to complete the project while ensuring that it is completed on time, on budget, and meets various requirements (e.g., design requirements, building codes, regulations etc.) set forth for the project, which may be difficult to accomplish without a particular methodology that breaks down work that needs to be carried out on the project into more manageable components. Accordingly, having an effective and efficient project management system in place is important for any organization trying to manage a complex project such as a construction project. OVERVIEW One methodology used for breaking down work to be carried out on a project into smaller, manageable components is known as a Work Breakdown Structure ( “ WBS ” ). In general, a WBS may define the univ

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (9)

PatentTitleYearCitations

Non-Patent Literature (10)

  • “
  • The Industry Standard for Construction Project Control and Transparency,
  • ”
  • Prolog Manager, Trimble, 2014, 4 pages.
  • “
  • Setting Up Cost Code Structures,
  • ”
  • JD Edwards EnterpriseOne Applications Job Cost Implementation Guide, Release 9.2, Oracle, https://docs.oracle.com/cd/E64610_01/EOAJC/title.htm, Jan. 22, 2019, 16 pages.
  • Brotherton, Shelly A. et al.,
  • “